Laserfiche WebLink
I.U EXECUTIVE SUMMARY AND INTRODUCTION <br />Northern Coal Company (now called Enron Coal Company) began <br />operating Rienau N 2 Mine since 1978. It was purchased from <br />another party and was operated under the interim permit program. <br />Northern opened the Northern N 1 Mine in 1980. It was located <br />approximately 3 miles north of the Rienau N 2, about 9 miles <br />north of Meeker, Colorado. <br />In June of 1980. Northern submitted <br />both existing mines and two new mines in <br />new mines were to be called the Northern <br />Mines. The application was submitted to <br />because o4 the federal land involved. A <br />submitted in the application for the 4- <br />a permit application for <br />the same area. The two <br />N 2 and the Northern N 3 <br />the State and to OSM <br />total of 12 volumes were <br />nine complex <br />CMLRD furnished a completeness review of the application on <br />March 2, 1981. OSM furnished the Apparent Adequacy Review on <br />April 4,1981 and CMLRD furnished the Technical Adequacy Review on <br />June 14, 1982. During mid-1982, market considerations forced the <br />temporary cessation of the Rienau M 2 and Northern N 1 Mines. It <br />was also during this time that Northern decided to only achieve <br />full permit status for the Rienau N 2 and Northern N 1 Mines. On <br />October 7, 1982, a modified permit application was submitted <br />which removed most references to the Milk Creak Loadout, the <br />Northern N 2 and the Northern N 3 Mines. Responses to all <br />completeness and adequacy concerns were also incorporated. <br />• Production and 5 year projections were scaled back for the Rienau <br />N 2 and Northern N 1 Mines in this submittal. <br />In early 1983, a potential environmental concern was raised <br />over the Rienau N 2 Mine entries extending under Curtis Creek. <br />Since the Northern N 1 Mine was temporarily sealed, it was <br />decided to submit a new application for mining only at the Rienau <br />N 2 Mine. The operation plan called for mining 10,000 tons per <br />year for 5 years, where all coal was to be produced from the 1st <br />East section, which had already extended below Curtis Creek. In <br />this way, no additional mining under the creek would be allowed <br />until the situation was resolved. <br />The permit application was submitted in Junv of 1984 and the <br />findings for approval was published by CMLRD in October of 1984. <br />The permit was actually signed on January 4, 1985. Some mining <br />for local stoker markets did take place during this time. <br />In early 1986, plans to fully reclaim both minesites and the <br />refuse facility were underway. p}so, the Wilson Loudy Loadout was <br />fully reclaimed in 1987. All bond liability for the Loadout has been <br />removed. <br />By fall 1986, the back4illing, grading, topsoil replacement, <br />• seeding and mulching had been done at all sites. Only 2 sediment <br />ponds at the Rienau N 2 site remain, which are to be removed once <br />the vegetation is established. A partial bond release request <br />for backfilling and grading was submitted to the Division on <br />February 12, 1987. <br />R-I <br />~/~/89 <br />~~7 /~ 7 <br />