Laserfiche WebLink
76 <br /> <br />Year <br />July <br />1978- <br />1979 <br />1980 <br />1981 <br />1982 <br />1983 <br />• 1984 <br />1985 <br />1986 <br />TOTAL <br />TAB 9 <br /> TABLE 9-4 <br /> Anticipated Topsoil Handling Schedule <br /> Nucla Mine, Montrose County, Colorado <br />Topsoil Topsoil Stockpile Inventory Take & Total <br />Supply Demand Acre/Feet put Handled <br />Ac.-Ft. Ac.-Ft. In Balance Out Ac.-Ft.~ Ac-Ft. <br />20.39 -0- 20.39 20.39 -0- -0- 20.39 <br />28.15 25.79 2.36 22.75 -0- 25.79 28.15 <br />21.02 31.35 -0- 12.42 10.33 21.02 31.35 <br />21.71 16.62 5.09 17.51 -0- 16.62 21.71 <br />19.24 16.62 2.62 20.13 -0- 16.62 19.24 <br />16.76 16.72 0.04 20.17 -0- 16.71 16.76 <br />-0- 12.59 -0- 7.58 12.59 -0- 12.59 <br />-0- 7.58 -0- -0- 7.58 -0- 7.58 <br />127.27 127.27 30.50 --- 30.50 96.76 157.77 <br />1Calculation of percent take and put: 96.76 Ac.-Ft. (take-and-put) 127.27 Ac.-Ft. <br />(topsoil supply) x 100 = 76.03 of total topsoil salvaged. <br /> <br />