Laserfiche WebLink
110 Permit Appl,cation (cont'd.) <br /> 14. Present land use (i.e. , agrl- 10 ,7 ,r'i�% / i/.:'w,/ <br /> cultural, industrial, etc.) <br /> IS. Proposed future land use I)PF /7G1//I/F (" D%' <br /> (Goal of reclamation) <br /> INFORIVED Ll. P SO L>> in.IrY <br /> INSTRUCTIONS: This application,and all accompanying materials must be submitted in duplicate. <br /> In the Interests of efficient processing, please Include the following Informa- <br /> tion S Items. Limited Impact Operations, see RULE J for guidance; Special I0- <br /> day Permits, see RULE 4 for guidance. <br /> .------—--------------------------'--------_____--------___ <br /> EXHIBIT A - Legal Description - - - -- --- <br /> The legal description must Identify the affected land and be wholly adequate for <br /> field location of the property. It can be In the form of metes s bounds survey <br /> or a description by reference to township, range, and section, to at least the . <br /> nearest quarter-quarter section. Where applicable, the street address or lot <br /> number(s) may be used. <br /> EXHIBIT B - Mining Plan <br /> This can be a general discussion of the methods, equipment, phases or stages of the <br /> operation and those portions of land affected by each. The plan should be <br /> correlated with the map and should show where extraction will begin, and which <br /> direction, If any, it will proceed. <br /> EXHIBIT C - Map This map should clearly define permit boundaries and indicate all toads or stockpile <br /> areas to be used in connection with the operation. All immediately adjacent landowners <br /> oust be shown. The quarter sectlon corner, section line, or-any other locateable points <br /> should also be shown on this map. <br /> EXHIBIT D - Wildlife, Water Resources, Vegetation and Soils Information <br /> Each of the above-mentioned subjects must be addressed as outlined In the applicable <br /> RULE. <br /> EXHIBIT E - Reclamation Plan <br /> As with the mining plan, this snouid be a general discussion of the methods, equipment, <br /> phases or stages of the reclamation process and those portions of land affected by each. <br /> If possible, the plan should be closely correlated with the map. If not, the narrative <br /> oust be comprehensive enough to draw an accurate verbal picture of the expected appear- <br /> ance of the area after completion of reclamation. <br /> EXHIBIT F - Proof of Local Government Approval <br /> ,This must be a letter from the local government specifying conformance with existing <br /> zoning regutatiu,,;. ;; I,-,tanded that operator- ,_y ="t=in local government approval <br /> concurrent with the Division's processing of the application. To do so, the operator <br /> Bust submit evidt.,,m -;.;ch Indicates that local govt. approval Is currently pending <br /> or will at least be considered within a reasonably short time by the appropriate <br /> gc%-Grnin� `sdy. 1.1(lo) .(consult this RULE for full details on this requirement.) <br /> MI'217 - coo--- ^s '•gal Right t, F.,rnr <br /> This c=1_4 be a copy of the lease, deed, abstract of title, or current tax receipt. <br /> An acceptable alternative would be a statement acknowledged by a notary public that <br /> the oFc.-"or has the legal right to enter and mine. _ <br /> EXYJ.B!_T u - Reclamation Costs _ <br /> If the surety Is requested to be less than $2500, the operator must submit facts to /V�H <br /> support such a request. Otherwise, a surety of $2500 will automa tically be set. <br /> •*+ FOR SPECIAL 10-DAY (I11) PERMITS ONLY +** <br /> EXH181T I - Terms of Governmental Contract <br /> For Special 10-Day (Ill) Permits, the operator must submit a copy of the contract or <br /> other proof that proves the necessity of a special 10-day permit. The operator must <br /> also submit evidence of the surety provided under the governmental contract, If It was <br /> required. <br /> NOTICE PROCEDURES <br /> After the application is considered "filed" (pursuant to RULE 1.1 (10) wl th the Mined Land <br /> Reclamation Division, notice procedures outlined in RULES 3.2 G/or 4.2 must be followed. <br /> (Format for such notices wl II be included in the letter you receive from the MLR staff <br /> Informing you of the completeness ("filing") of your application. <br /> ADDITIONAL INFORMATION <br /> This space can be referenced for further Information of any of the Items on this form. <br /> TNF /Ti/ IJ F 2/7-kS lif///_ /_ /74//V <br /> /N I �,4R,c %/NIF,50 <br /> To the best of my knowledge, all the Information presented in this application Is true <br /> and correct. f.��J // 4 <br /> �RyL� GYGt4."raj,/ BY <br /> r <br /> TITLE <br /> R Diu' Si ad by divid leg y suthor- <br /> I ad to nd th pe rat to this <br /> application.) <br />