West Elk Mine <br />rock storage azea (maintenance shop bench), but all refuse or waste was removed before <br />construction of the earthen fill to make a pad for the shop. Coal refuse is transported from the mine <br />on the run-of--mine belt and/or is hauled with equipment out of the main portal. This refuse may be <br />temporarily stockpiled in the screening plant reject bin or on the stacktube bench, and on the portal <br />bench or in the nearby concrete bunkers, respectively. The amount of coal refuse produced is <br />variable. The refuse material which accumulates in the temporary storage areas, is hauled by truck <br />to the permanent refuse disposal azea. <br />Three permanent refuse disposal areas and one development waste pile are permitted at the West <br />Elk Mine. Initially, refuse was temporarily stockpiled in an azea formerly called the U.S. Steel <br />laydown azea. This azea has been enlarged and converted to a permanent refuse pile called the <br />Lower Refuse Disposal Area or Lower Refuse Pile (LRP). A permanent refuse pile is also <br />perntted for the meadow above the portal bench. This azea is referred to as the Upper Refuse <br />Disposal Area (URDA). Although this upper refuse disposal area has been approved for <br />construction, it is not yet needed. Thus, construcfion of the Upper Refuse Disposal Area will occur <br />in the future, if needed. All construction information about these two disposal azeas is contained in <br />Exhibit 50 (URDA) and Exhibit 51 (LRP). As MCC believed that the Lower Refuse Pile would <br />reach its maximum storage capacity in 1997 (and before completing construction of the ventilation <br />shafts in Sylvester Gulch), a third refixse disposal azea was designed. The Refuse Pile Expansion <br />(RPE) azea was designed and prepared to the east of the Lower Refuse Pile and east of Sylvester <br />Gulch. As described in Exhibit 51, refuse disposal at the LRP has been temporarily inactivated <br />before reaching the maximum designed storage capacity, because all refuse disposal is being <br />handled in the RPE azea (as of October 1998). The design information and baseline data for the <br />RPE azea aze contained in Exhibit 70. The Lone Pine Gulch Development Waste Pile was designed <br />to contain approximately 17,000 cubic yazds of material generated from the development of the <br />Lone Pine Gulch fan intake and return entries. Designs for this pile aze contained in Exhibit 42A. <br />The pile is currently in final reclamation. It was convered with subsoil and topsoil and seeded in <br />the fall of 1995. <br />Although most of the refuse material generated at the West Elk Mine will end up in the waste <br />disposal azeas, some non-coal waste may be disposed of in one of two other ways. First, some non- <br />combustible materials may be placed in abandoned F-Seam workings. Second, suitable materials <br />may be crushed and used for graveling roadways in the mine. Overall, relatively tittle material will <br />be disposed of using these alternate methods. <br />All disposal azeas and the development waste pile were designed and aze maintained according to <br />CMLRB regulafions. They aze not located neaz underground mine air shafts, tipples, or other <br />surface installations. The Lower Refuse Disposal Area has a sign posted with the assigned MSHA <br />identification number and other necessary information. hi addition, the sign is at least six feet above <br />the ground or waste surface and is located next to the area entrance. A similaz sign has been posted <br />at the Lone Pine Gulch development waste pile and at the RPE. <br />2.05-43 Revised Jart. 1997 TR79 <br />