My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127400
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:31 PM
Creation date
11/25/2007 4:39:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Permit File
Doc Name
TALLAHASSE DRAINAGE BASIN STUDY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i <br /> <br />i' <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />Based on the foregoing parameters, peak flow and peak time were established for each of the 75 <br />sub-basins fora 10 year-24 hour storm and a t00 year-24 hour storm. See Exhibits IX and X. <br />Exhibit XI show the hydrographs at the exit point of each of the l3 basins, using the Muskingum <br />Routing Method for the 100 year-24 hour storm. <br />Exhibit XII and XIII show the total flows and peak times of a 100 year-24 hour and a 10 year-24 <br />the anticipated peak flow at the area where the Tallahassee Creek exits into the Arkansas River. <br />hour storm, respectively, by routing and combining the hydrographs of the 13 basins to establish <br />CONCLUSION <br />1. Bridge Crossings <br />The following procedure is rued [o establish the clear opening required for the bridge crossings. <br />The 10 year-24 hour storm has been selected for the bridge design. <br />Q = 0.4A°" <br />Q =Peak Flow in cfs A =Area in square feet <br />Q = 847 cubic feet per second (cfs) <br />A°0=8.47/0.4=2117.5 A=2117.5''==312.15feet~ <br />The bridge openings will be designed to provide <br />a minimum square feet opening of 312 square feet <br />Velocity of Stream: V = Q/A = 847/312 = 2.71 feet per second (fps) <br />The flow velocity is below 5 fps which creates no disturbance in the stream channel per information <br />from Mr. Berhan Keffelew of the Department of Mines & Geology. The intent is to provide rip-rap <br />at both bridges regardless of the water velocity. Reference Bridge Crossing Drawings C-1 & C-2. <br />PAGE 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.