Laserfiche WebLink
i <br />EXHIBIT C 5 <br />a. The operation will commence October 15, <br />completed by October 15, 2002. <br />• <br />1997 and will be <br />b. The purpose of the operation is to remove the existing waste rock <br />and alluvium, to provide a suitable building site for industrial, <br />commercial or residential use. No material will be removed at an <br />elevation lower than the present ground surface, although some of <br />the excavated material may be used to level and increase the <br />elevation of some areas. <br />c. All of the material excavated will be removed from the site, <br />except that which is used for fill to level the site. Ther is no <br />soil on the waste rock and/or alluvium. <br />d. The thickness of the deposit is from ground level up to ft. <br />e. The waste rock/alluvium will be excavated with a front end <br />loader, screened and hauled from the site. No buildings or other <br />equipment will be needed. <br />f. The purpose of the project is to remove and reclaim existing <br />waste rock and alluvium. <br />g. The property adjoins U.S.Highway 550. No additional roads will <br />be necessary. <br />h. No water will be used for the operation. <br />j. N/A <br />k. The purpose of the project is to remove the existing waste rock <br />and alluvium and use it for fill and road base in other locations in <br />the county. The material being excavated is very similar in <br />composition to that which has historically been used by the City of <br />Ouray from the Skyrocket drainage, just south of this area. <br />1. The removal of this material will improve the configuration and <br />stability of the property, since the material will not be available <br />for natural transport if water flows into the intermittant drainage. <br />m. Screening of the material will be conducted on site. <br />fiXHIBIT D <br />The purpose of <br />area into a useabl <br />project is what is <br />Mining Plan is the <br />only be added once <br />City of Ouray. <br />the mining project is to reclaim the existing <br />e and attractive site. Since the mining for this <br />considered reclamation in many other areas, the <br />Reclamation Plan. Additional vegetation will <br />a development is proposed and permitted by the <br />