Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM -EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task #... 12 Prep. by RCO Filename..M285-12 <br />Date..... 30-Ju1-97 Permit # M-77-285 Mine......SUnday Mine <br />Permit Action........ Final Reclamation <br />Task Description..... Mobilization of Equipment <br />HOURLY EQUIPMENT COST <br />NOTE - This is a List to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor bx4, 75,000 lb GVN, 375 HP, di eseL powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-Hvy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Lar On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasolint powered <br />-Nyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp~, 60 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon rapacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GVw, 175 HP, diesel powered <br />Last Update: -'______________________________ __________ ________________ ______"---_""__ _-----"-___ <br />December, 1994 <br />--------------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: c=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />___________P __________________ <br />Ounershi Cost/hr - 827.88 ________________________________ <br />831.23 838.36 81.81 __________ <br />819.89 ________________ <br />86.95 _________________ <br />812.79 __________ <br />88.71 <br />Operating Cost/hr = 826.84 829.29 834.27 85.12 823.40 816.53 824.82 88.00 <br />Operator Cost/hr = 821.40 822.03 822.03 821.24 820.86 821.24 821.24 821.24 <br />Helper Cost/hr = 820.60 821.24 821.24 80.00 80.00 80.00 80.00 80.00 <br />Total = 896.72 8103.79 8115.90 828.17 864.18 846.72 888.58 834.95 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Wei 9ht Ownership Haul Rig Fleet S ize Haul Trip Return Trip DOT Permit <br />Machine DeSC ripCion (tons) Cost/hr Cost/hr (no. hauled) Cost/hr <br />_________ Los[/hr <br />_________________ Cost/ea <br />__________ <br />_______________________________ <br />Cat D9N Dozer w/ripper ________________________________ <br />47.00 848.37 8103.79 __________ <br />1 _______ <br />8182.16 E1 )3.79 80.00 <br />Cat 966E Loader 23.00 827.72 E9b.72 1 8124.44 896.72 80.00 <br />Tractor w/ reveg equi pmt. 13.00 820.00 896.72 1 8116.72 8'76.72 80.00 <br />-------------Subtotals-.--_----8393.32--------8297.23--------EO.OD <br />