Laserfiche WebLink
LIST OF ATTACHMENTS <br />Attachment No. <br />20-1 Reclaimed Drainage Calculations <br /> LIST OF EXHIBITS <br />Exhibit No. <br />20-1 Five-Year Permit Area Disturbance Map <br />20-1A Five-Year Permit Area Disturbance Map III-W South) <br />20-2 Postmining Topography <br />20-2A Postmining Topography III-W Southl <br />20-3 Post Disturbance Topography - TAHR <br />20-4.1 Pre and Postmining Slopes Cross Section S-1 <br />20-4.2 Pre and Postmining Slopes Cross Sections S-2 and S-3 <br />2.0-4.3 Pre and Postmining Slopes Cross Sections S-4, S-5, and S-6 <br />20-4.4 Pre and Postmining Slopes Cross Sections N-1 and N-2 <br />20-4.5 Pre and Postmining Slopes Cross Sections <br />20-5.1 Postmining Stream Channels 006 Gulch <br />20-5.2 Postmining Stream Channels 006-NE7 <br />20-5.3 Postmining Stream Channels 006-NE2 and 006-NE1 (Upper Portion) <br />20-5.4 Postmining Stream Channels 006-E1 <br />20-5.5 Postmining Stream Channels 006-SE1 <br />20-5.6 Postmining Stream Channels 005-E1 <br />20-5.7 Postmining Stream Channels 005 Gulch <br />20-5.8 Postmining Stream Channels 006-NE3 and 006-NE4 <br />20-5.9 Postmining Stream Channel Profiles II-W South <br /> <br />• <br />• <br />Revised 9/98 <br />