My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127135
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:16 PM
Creation date
11/25/2007 4:18:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007010
IBM Index Class Name
Permit File
Doc Date
2/7/2007
Doc Name
110c application
From
Weber Sand and Gravel
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(h) Due to the limited scope of this operation, usage of less than 1,000 gallons of <br />water per day is anticipated. Water will be obtained from either the Navajo <br />River or from other approved sources. <br />(i) No ground or surface waters will be encountered in this operation. <br />(j) No water will be imported to this site that is not authorized by the State of <br />Colorado. <br />(k) No acid or refuse producing materials will be exposed in the performance of <br />this operation. <br />(1) Because of the limited depth of disturbance relative to the hydrologic system <br />in the valley, there is no indication that any impact to this system will occur. <br />Drainage of the remaining access road will be such that no offsite impact will <br />occur. <br />(m) The scope of on-site processing of materials is limited to further sizing of the <br />material to be excavated. Primazily, this will involve the use of a hydraulic <br />breaker (hammer). Secondarily, a small portable crusher may be employed to <br />produce smaller size materials if necessary. <br />(n) The primary materials removed from this site are boulder size rock. Secondazy <br />products include landscaping materials and tertiary base course. <br />(o) No incidental materials aze anticipated in this operation. <br />(p) The use of explosives is anticipated in the excavation of the proposed access <br />road. (See attached Geotechnical Stability Exhibit) <br />
The URL can be used to link to this page
Your browser does not support the video tag.