Laserfiche WebLink
<br />EXHIBIT E - Reclamation Plan <br />Following mining, banks will be sloped to not steeper than 5:1 slopes. <br />Overburden will be spread over the site maintaining the 5:1 or flatter <br />slopes. Topsoil will be replaced to a depth of 8", compacted and seeded <br />to cover crop of forage sorghum in Spring or early Summer. Forage <br />sorghum at seeding rate of 8" pls per acre will be drilled. Late Fall or <br />early Spring seeding of following mixture will be seeded using a suitable <br />drill. <br />Specie Variety 11PL5/Ac <br />Little bluestem Postura 1.75 <br />Sidecoats groma Vaughn 2.25 <br />Sand bluestem 4.00 <br />Switchgrass Nebr. 28 1.25 <br />Blue Grama .25 <br />Fertilizer will be applied at the rate of 4011 available N at seeding of <br />cover crop and again at seeding of permanent grass. Area should be <br />fenced to give grazing control. <br />