Laserfiche WebLink
1 ,~. <br />.~ <br />ti~ <br />lr <br />f <br />•i <br />~ ~8 ]F/ <br />s <br />DEPARTMENT OF <br />~II ~I~II~II~II~~II~ <br />1 <br />NAT <br />• g~ <br /> <br />RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Dlreetor <br />May 13, 1987 <br />John T. Ungefug <br />Southway Construction Co. Inc. <br />117 White Pine <br />Alamosa, CO 81101 <br />Re: M-87-013 Burton Pit, Permit Issuance <br />Dear John T. Ungefug: <br />On May 06, 1987, the Mined Land Reclamation Division found Southway Construction Co. <br />Inc. to have satisfied the applicable requirements of C.R.S. 34-32-101 et sea. for <br />ohtaining a mining and reclamation permit. Therefore, a permit is being issued, <br />Two signed originals of the permit have been executed. We have kept one copy for <br />our files and are enclosing one copy for your use. Please read the terms of the <br />permit. It is your responsibility to comply with all of the terms of the permit. <br />Asa reminder, here are a few things we feel are important. <br />1. All of the original application materials, as amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by <br />reference. We presume that you have a copy of all of these materials; therefore, <br />none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for <br />operating personnel, to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest consulting <br />the Minerals Rules and Regulations and/or contacting us to determine if a revision <br />to the permit is necessary. Rule 1.8 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1,10 to Conversions. <br />3. On your permit anniversary date each year, May 06, you must submit an annual fee <br />and an annual report to us. The annual fee for this permit is E50,00. Please <br />consult Rule 3,4 for 110 Permits, and Rule 2.4 for 112 Permits, and Statute Section <br />34-32-116(1)(a) for 111 Permits, for the specific annual report requirements <br />applicable to your mine. <br />If you have any questions, please contact me. <br />Si erel ~/ <br />~~~~~~G <br />DAVID C. SHELTON <br />Director <br />Enclosures <br />3324G <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />