Laserfiche WebLink
FROM DARRELL CDNCRETE~MING. INC. PHDNE ND. 303 345 ~8 P02 <br /> <br />EXHIBIT D - Mining Plan <br />(a) Gravel will be removed from thQ rotor n•.: ttant stream bed with a <br />#rnn(: end )na~fFr and hauled via dump truck to the plant <br />headquarters 3n Akrgn, Colorado. <br />(b) If topsoil exists, it will be salvaged for a depth of 6"!12" <br />and st nr_k pi]Pd until used in roclamation_ No other earthmoving <br />will occur, except actual gravo2 removal as described in (a)_ <br />(c) none <br />(d) Disturbance to the permitted area will occur in approximate <br />tin acre Segments. <br />(e) Gravel will ba removed from the bed of the ctroam_ Early <br />phase mining is planned to occur qn the couth side of the <br />highway (upstream end)_ Due to canseyuencas of high flow <br />I.~ari ods, operations may move about the permitted area as <br />y~avel deposits dictate, but disturbance will bo limited to no <br />mire than 30 acres at any given Lime. The mining timetab2a for <br />this permit should span at lwact. 20 years, with each phase <br />taking about 10 years. <br />(f) See Exhibit C (h) - Soils Map. The Surveyor CreeR <br />intermittent drainageway consists of Tina and gravelly candy <br />loam_ It is formed in alluvium from mixed reworked sandy and <br />loamy materi a2. The depth of depoci~ta range from 4" to 60"_ <br />Tt~e substratum is a stratified loamy sand and sandy loam_ <br />