My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127005
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:09 PM
Creation date
11/25/2007 4:09:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
Permit File
Doc Date
6/21/1999
From
SIERRA MINERALS CORP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE% E LOESBY pE 3037719652 <br />P. 02 <br />• . <br />Assume sixteen hours of earthwork using a large wheel loader at a rate of $200 per hour including labor, <br />consumables, and mobllization ($3,100). An additional 4 hours with a large backhce at $200 per hour will also be <br />required (5800). Waste material is readily available from existing waste piles close to entries. Large waste blocks <br />will be placed, then wills filled with smaller waste rock and fines. A 4 inch drainage pipe will be placed in the <br />lowest portal before backfilling to allow drainage from the quarry down tot the sediment control structure, a distance <br />of alwut 300 feet. A screened sump inside the quarry will collect water. The Cost of the sump, pipe, and <br />installation is estimated ai 52,0(10. <br />(1) Assume four days of work for a hackhoe at $100 per hour to perform Initial cleanout, then a return trip after two <br />years far a final cleanout <br />(3) Assume five toot steel or iron fencing with picksts placed on spacing of 4 inches and painted taps designed to <br />discourage climbers, similar to that placed by the Inactive Mine Program (1MP) in the mid•1980s. Fencing should be <br />placed so that at ne time may the public be subject to rock falls from above the quarry entries, The total length of <br />fencing is estimated at 100 feet as much of the fencing placed by IMP is still in place and effective. The cost is <br />estimated at $30 per lineal foot including Installation labor and mobilization tar a total of $3,000. This estimate is <br />based on the lower- to mld•range quote from four fence contractors. A $59 eslimafB was received from Standard <br />Fence of Denver, a ~5 estimate was received from Elcar Fence of Denver, a $30 estimate was received from Split <br />Rail Fence of Denver, and a low bid of $26 was received from Green Mountain Ornamental Iron In Lakewood. <br />(4) Assume 8 hours plovdnq with small tractor at $11t) per tour including labor, consumables, and mobilization. <br />(5 Assume 6 Inches of topsoil over 1/3 acre or approximately 270 cubic yards of Topsoil, Topsoil to be hauled to <br />the site from Carbondale, 35 miles away, Quotes were solicited from a number of haulage contractors. The average <br />was $25 per yard delivered to the site all inclusive. <br />(6) Assume 8 hours spreading with a small loader/spreader at $F4 per hour including labor, consumables, and <br />mobilizatOn. <br />(1) Assume 3 hours seed drilling at $60 per twur and 1400 pounds of mulch applied at a rate of E500 per acre <br />including labor, consumables, and mobilization. <br />(8) Assume 60 tree seedlings in 4 groupings at a rate of $15 per tree and 50 shrubs seedlings at a rate of $15 per <br />shrub including labor, consumables, and mobilization. <br />(9) Assume two crazy-2~s e+~'r<me thdc a9iabers two days at $40 per tour for removal of cables and curtains. <br />Assume 6 days for two workers to remove temporary fencing and drainage pipe (if not burled) at S40 per hour. <br />(10) Assume 6 days for two workers to improve loot trail at $40 per hour. <br />Maximum disturbance of the land is anticipated at the end of the mine life when the <br />marble waste piles have reached their maximum size. However, the amount of land to be <br />revegetated is limited to a portion of the access roads on the surface of the waste piles. The total <br />area to be revegetated should not exceed 1/3 acre, even at the rims of maximum disturbance. <br />l5 <br />