Laserfiche WebLink
iii iiiiiiiiuiii iii <br />999 <br />August 29, 1878 <br />Mr. William G. Lausr <br />Sterling Saad & Grad Co. <br />1800 N. Taft Hill Resod <br />Ft. Coiling, Ce 80522 <br />RE: Pit O1 Our File 477-439 <br />Pit 02 Our File /77-440 <br />Pit 03 Our bile 077-441 <br />Dear Mr. Lauer: <br />~~~~ ~-Z~ <br />I have recently taken over reaponaibility for the above-referenced <br />applications, and nave just finished a careful review of these: appli- <br />cations. There are several areas of concern that must be addcesaed <br />before these applications can be considered adequate. The questions <br />below refer to all three applications unless stated otherwise, as the <br />written material format submitted in each is similar. <br />EY.HIBIT ll - MINING PLAN <br />1. What is the sire of the area to be worked at any one time for each <br />pit? <br />2. Nhat is the maximum acreage disturbance to be included in mayor, <br />moderate. and minor disturbance c~isaes for each pit2 Please refer <br />to Rule 2.12 (4) d (i-iii). <br />3. [dhat is the thickness and type of overburden to be removod foz <br />each pit? <br />E:[flIBIT E - RHtS.AKATIOti PLAIT <br />T;+e :toles and Regulations require a detailed and specific discussion <br />of the methods of reclamation. <br />1. Final grading - What ie the maxiffium anticipated final slope'.' Be <br />a advised that the performance standards of the Rules and Regulations <br />require pond ban:: slopoa be o! 3:1 or less for the area five: feat <br />above to ten feet below the expected waterline, sad 2:1 or l.eae <br />elopes elsewhere. <br />2. Topsoiling - What is the thickness or sage of thickness to be <br />spread back over the areal <br />3. Will fertiliser or mulch be used? If so. how much sad what kind? <br />