My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126919
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:04 PM
Creation date
11/25/2007 4:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Permit File
Doc Date
2/9/2001
Doc Name
READY MIX PN M-1977-023 RECLAMATION COST RECALCULATION BOND INCREASE NOTICE
From
DMG
To
VALCO GUNNISON CONCRETE DIVISION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PUMPING WORK <br />Task no. 004 State ~ Colorado Permit/lob no.: M-1977-023 <br />Date . 02/06/2007 County .Gunnison Abbreviation :none <br />User : RCO Site Ready Mix Prt Filename : M023-004 <br />Agency or organization name : DMG <br />Permit or other job action :Band review <br />Task description : Dewater SE pond (pump down 10 feet) for 3:1 bank shaping <br /> <br />HOURLY EQUIPMENT COST <br /> <br />(Description Ouanlity Data <br />Source <br />Pump . CentnNgal pump, 70.0 ih. 1 (CRG) <br />Suction hose : Suction pipe, 10 in. diam., 20 h. L 2 (CRG) <br />Discharge hose : Discharge pipe, 10 in. D, 50 tt. L 2 (CRG) <br />Labor NA 0 NA <br />Cost Breakdown <br />Ownership cost/hour <br />Operating cost hour <br />Operator cosVhour: <br />Total cost/hour <br />Job Utilization <br />$3.85 NA <br />$8.20 100 °b <br />$0.00 NA <br />$12.05 <br />Job shift basis : 3 per day <br />Horsepower : 70 <br />Weight (UST) : 7.95 <br />Total fleet cost hour : $12.05 <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume: 101.00 acre leet factor: 325.850.5800 volume: 32,910,909 gallons <br />Total pond inflow surtace Unit inflow rate in Total pond inflow volume <br />area : 93,000 sq. ft. gph/sq. ft.: 0.3516 per hour : 32,698.80 gph <br />Source of volume estimate ~ 124/01 inso: 3720' oehmeter x 25' est. deofh. 10.74 ac suA. <br />PUMPING TIME <br />Rated pump capacity : 200.000 gph/pump Total pumping capacity : 200,000 gph <br />Initial unadjustetl pumping time : 764.55 hours <br />Inflow as °h of pond volume . NA °h Inflow during initial pumping time : 5,380, 736 gallons <br />Net unadjusted pumping lime : 191.46 hours <br />Pump efficiency lactor : 0.9161 (55 minlhr.) <br />Total adjusted pumping time ~ 208.86 hours <br />JOB TIME AND COST <br />Total job time : 208.86 hours <br />Unit cost : $0.000066 per gallon Total job cost : $2,516 <br />
The URL can be used to link to this page
Your browser does not support the video tag.