My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126919
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:04 PM
Creation date
11/25/2007 4:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Permit File
Doc Date
2/9/2001
Doc Name
READY MIX PN M-1977-023 RECLAMATION COST RECALCULATION BOND INCREASE NOTICE
From
DMG
To
VALCO GUNNISON CONCRETE DIVISION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Wor~ont'd Task # . 072 ~ sheet 2 of 2 <br />Loading Tool Cvcle Time ~ Number of loading tool passes required to fill truck : 3 passes <br />Excavators and front shovels -machine cycle lime vs job condition rating NA <br />-selected value within basic rating . NA <br />Track loaders -material tlescr.: NA <br />-cycle lime elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.550 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material: No adjustment-factor not applicable 0.000 (Cat HB) <br />Stockpile No adjustment - /actor not applicable 0.000 (Cat HB) <br />Truck ownership : No adlustment - /actor not applicable 0.000 (Cat HB) <br />Operation : Constant operation -0.040 ~ (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adustment : -0.040 minutes <br /> Adlusled basic cycle time : 0.510 minutes <br />Net load time per truck (bulk of first loader pass com pleted during truck exchange) : 1.120 minutes <br />Truck Cvcle Time <br />Truck exchange time 0.50 minutes........ Adjusted for site altitude 0.52 minutes <br />Truck load time 1.120 minutes........ Adjusted for site altitude 1.12 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adlusled for site altitude : 0.93 minutes <br />Truck travel (haul 8 return) time <br />Road condition description : Putted dirt. little maintenance, no water, 2" fire penetration <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (°b) Rolling <br />res. (°b) Total <br />resistance (%) Speed <br />leet/minufe Travel time' <br />(minutes) <br />1 600 0.00 5.00 5.00 1695 0.53 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />Haul time": 0.55 minutes <br />minutes <br />mmutes <br />Loading tool unit production : 520.04 LCY/hour...... Adjusted for job efficiency : 431.63 LCY/hour <br />Truck unit production : 241.48 LCY/hour...... Adjusted for job efficiency 200.43 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. truckslloader : 2 trucks <br /> Adjusted hourly truck team production : 400.85 LCY/hr <br /> Adjusted hourly single trucWloader team production ~ 400.85 LCY/hr <br /> Ad)usled hourly multiple trucWloader team production 400.85 LCYlhr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 40.46 Hours <br />Unit cost : $0.575 /LCY Total jab cost ~ $9,323 <br />• Grsr antl last segments ad/uslea 1°r acceleration/deceleuu°n Return time " ~ 0.41 <br />lime shown ~nduaes aunude atllus[ment Total truck cycle time ~ 3.52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.