My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126919
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:04 PM
Creation date
11/25/2007 4:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Permit File
Doc Date
2/9/2001
Doc Name
READY MIX PN M-1977-023 RECLAMATION COST RECALCULATION BOND INCREASE NOTICE
From
DMG
To
VALCO GUNNISON CONCRETE DIVISION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> Agency or organization name : OMG <br />Task # ~ 009 State :Colorado Permitljob # : M-1977-023 <br />Date : 01/062007 County .Gunnison Abbreviation :none <br />User : RCO Sile .Ready Mix Pit Filename : M023-009 <br />Permit or other job action :Bond review <br />Task description :Haul topsoil [o pond banks for spreading <br />HOURLY EQUIPMENT COST Shitt basis 1 per day <br />(Equipment Description <br />TrucWloader team -Truck Generic 72-18 cy, 6x4 <br />-Loader .CAT 966E S.2 high lilt (1999) <br />Support equipment -Load area ~ NA <br />-Dump area : NA <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : TrucWLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Impart data filename : truck2 loader NA NA NA NA <br />°b Utilization-machine : 88 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosUhour : $20.12 830.78 NA NA NA NA <br />Operating cosVhour : 823.47 830.74 NA NA NA NA <br />Ripper ap. cosVhour: NA NA NA NA NA NA <br />Operator cosVhour : 823.61 827.99 NA NA NA NA <br />Unit subtotals ~ 867.20 889.51 NA NA NA NA <br />Number of units : 3 7 0 0 0 0 <br />Group subtotals : Work : 8291.11 Support : 80.00 Maintenance : 80.00 <br />Total work team cosVhour : $291.11 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 6,511 CCY factor: 1.125 volume: 7,325 LCY <br />Source of quantity take-off : 1/24/07 insp: tot perimeter x 40' avg width @6' deep <br />Source of estimated swell factor : n/a <br />Material purchase cost : 80.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis ~ Truck Bed (volume) Basis <br />Material weight : 2.550 poundslLCY Struck volume : 12.00 LCY <br />Descr.: Earth -dry packed Heaped volume . 18.00 LCY <br />Rated payload : 48.000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capac ity based on specific number of loader passes : 14.18 LCY <br />Loading Tool Caoacit <br />Rated capacity (nom. heaped) ~ 4.500 LCY <br />Descr.: Other-moist loam (100-710% ) <br />Bucket till factor : 1.050 <br />Adjusted bucket capacity : 4.725 LCY <br />sheet 1 of 2 <br />ob Condition Corrections : Site altitude (ft.) : 7, 700 <br /> Truck Loader Source <br />Altitude adj.: 0.970 1.000 (Cat HB <br />Job efficiency : 0.830 0.830 (1 shilt/tla) <br />Net correction : 0.805 ~ 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.