Laserfiche WebLink
! t • <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 007 Stale : Colo2do <br />Date' 071062001 County :Gunnison <br />User: RCO Site:Reatly Mix Prr <br />Permit or other job action : Bond review <br /> <br />Task description : Grade SE pond slope to 7:1 <br />HOURLY EQUIPMENT COST Basic machine : Cat Od <br />Blade type :Semi-( <br />Attachment no. 1 : ROPS <br />Attachment no. 2 :3-span <br />Cost Breakdown : Ownership cosVhour : E44.( <br />Operating cosUhour: E64.s <br />Ripper op. cosUhour: E0.7 <br />Operator cosvhour: E27.S <br />Total unit cosVhour : E137 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 13, 77B BCY factor <br />Sourcc of quantity lake-oil :124/07 insp: <br />Source of est. swell factor : Na <br />HOURLY PRODUCTION <br />Average push distance: 50 leel <br />Unadjusted hourly production . 1180 LCYlhr <br />Material consistency description <br />Compacted OII or embankment <br />Average push gradient : 20.00 % (negJ <br />Average site altitude : 7,700 leet <br />Material weight : 3,300 Ibs/LCY <br />Material weight description'. <br />Decomposed rock - 75% Rock, 26% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost: E0.261 /LCY <br />PermiUlob#:M-1977.02) <br />Abbreviation :none <br />Filename : M023-007 <br />Horsepovrer: 285 <br />Shift basis : 1 per day <br />Utilization ;b Cosl data source: (CRG) <br />NA <br />100 <br />f0 <br />NA <br />Total Beet cosUhour : 5737.13 <br />Loose <br />volume: 19,703 LCY <br />1:1 <br /> <br />Operator skill: <br />0.75 Source <br />(avg.) <br />rlerial consistency: 0.90 (Cd1 HB <br />Dozing method : 1.00 (gen.) <br />visibility: 1.00 (avg.) <br />Job elBc~ency : 0.83 (1shiNtla <br />Spoil pile: O.BO (Intl-A) <br />Push gradient : 1.43 (Cal HB <br />Altitude : 1.00 (Cat HB <br />Material weight: 0.70 (Car HB <br />Blade type : 1.00 (S or U, <br />Nel correction : 0.45 <br />led unit produdion 525.31 LCY/hr <br />ed Beel production : 525.)1 LCY/hr <br />Total job time : 37.51 Hours <br />Total loh cost: $5,147 <br />