Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description ~ Cost (E) <br />________I__________________________________________________I___________ <br />2 I Seal and safeguard adit and vents ~ 52,892 <br />_______________________________________________________________________ <br />Subtotal (K ): 52,892 <br />L. GRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description I Cost (5) <br />__________________________________________________________I__________ <br />NA Not indicated ~ <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />1 ~ Demolition per attached task 1 worksheet ~ 511,352 <br />6 ~ Seeding per attached task 6 worksheet ~ 55,555 <br />NA I Fencing not required at [his time <br />7 I Mob/Demob per attached task 7 worksheet I 51,547 <br />________________________________________________________________________ <br />Subtotal (M ): 818,454 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 526,690 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />________I <br />1. ~ ______________________________~__ <br />Public Liability Insurance.... ________ <br />1.550% ___ <br />of _____ <br />dir. I___________ <br />~ 5414 <br />2. ~ Contractor's Performance Bond 1.5507. of dir. ~ 5414 <br />3. ~ Contractor's Profit........... 10.OOY. of dir. ~ E2, 669 <br />4. ~ Job Superint endent..per attached task 8 sheet ~ 51,993 <br />Subtotal (A ): 55,490 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 532,179 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description <br />1. ~ Minerals Program Admin. Fee at <br />Cos[ (E) <br />5.007. of cntr.l 51,609 <br />NET INDIRECT COST PERCENTAGE: 26.60% <br />Subtotal (B): 51,609 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E7, 099 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 533,788 <br />