Laserfiche WebLink
• <br />GEX COLORADO INC. <br />RECLAMATION PLAIT <br />OVERLAND CONVEYOR <br /> Unit <br />item uantit Unit Cost Cost <br />Removal of Structures <br />Labor 3,360 Man/Hr E 17.20 E 57,192 <br />Equipment. 1,560 hr 29.30 45,708 <br />Earthwork <br />Excavation Cu-Yd <br />fill Cu-Yd <br />Spreading Topsoil 4,800 Cu-Yd 1.25 6,000 <br />Orill Seeding 6 Acre 40.00 240 <br />Mulching 6 Acre 175.00 1,050 <br />Hydroseeding & Mulching Acre 900.00 <br />Fertilizer Acre 372.00 <br />Seed 6 Acre 64.00 384 <br />Totals 5111,174 <br />