Laserfiche WebLink
' Revision Date: SIO1I03 <br />Western Pipelines (or: <br /> Colorado Interstate Gas Co. <br />^ 1.I Paso Natural Gas Co. <br />^ Idojave Pipeline Operating Co. <br />^ fNyoming Interstate Company <br />Permi~~: Requested by -+}-n.~ k ~C o/~e , ,1 /. <br />Name LecnG S~.r.{ F/rn vtl, LLC <br />Address sod s. to„G~1-sl. .rte. ;, .c:Arcn Sro~~ <br />Phone (7r7) .i•vF- Hilo <br />eipaso <br /> <br />//'~// ego-ao99 <br />Your gas company representative is ~ao~ ~et~e^un (~rsl 3-s9-e4ss ~. 6,c%.. N.rnh~st ~rY Phone (Collect Calls Accepted) <br /> ENCROACHMENT LOCATION <br />SECTION: <br />3y <br />33 TOWNSHIP: <br />3ZS RANGE: <br />( <br />3GJ COUNTY: <br />L <br />~ <br />. <br />~~.s <br />L ST: PM: <br />C'~ ( <br />g o is <br />r <br />n <br />. ~ <br />LATITUDE: LONGITUDE: LENGTH: STATION N0: ~ <br />LINE= LIST NO.: ROW WIDTH: ALIGNMENT SHEET <br /> <br /> ENCROACHMENT DESCRIPTION <br />~ <br />/'/c,f ~~~.[c~' ~ S~vhi -'F~ac~+~S c~: ~~ croJS < .~:1 S~Fc; wi// lic% Ma,ir~.: :r <br />C$/r <br />' <br />~ F:+c%ieS. ~/> <br />1 ~il~ f /~i i.ic <br />pct E.A:6:f ~~.n (~/fr.^ tla~t.•l /17~ /.~~ Pius ~ <br />/ <br />/ <br />/ <br />Goof, c: r./ /'a/:.irr.~ern7S - Sez Fx~i,E~'f .,Q ,• <br /> <br />O//~'ne Call number//for you//r area is 4a'J - 9,2~ - /9~'7_ ~ ~ . <br />l..c~,~r~" ~ri,s /ale G.is Cn. ("Grantol') hereby grants a permit to install, maintain and operate the above-referenced encroachment facilities <br />("Permitted Facility') on the above-referenced Company easement or other property ("the Property"). This permit is granted subject to the terms, <br />requirements, and conditions shown below and strictly in accordance with the general requirements and item(s) F..y.A~ f 71" E B"~ <br />of the encroachment specifications shown on the following page(s). <br />DAMAGE PREVENTION: Permittee agrees that it shall not begin <br />construction upon and along the Property u nlil Permittee first provides <br />Gram:or with plans and spedficatians and until such plans and <br />specifications have been approved by Grantor. Permittee further agrees <br />to contact the following the statewide associations (One Calp within its <br />area at least two working days prior to the commencement of <br />construction on the property. Such construction shall be made only when <br />a representative of Grantor is present at the lime and place of <br />construction. The instructions of such representative relating to the <br />safety of the pipelines or other facilities of Grantor shall be followed by <br />the Permittee, its agents and employees. Any damage done to Grantor's <br />facilities incurred due to Permitiee's failure to adhere to the state "CALL <br />BEFORE YOU DIG" law, or incurred during construction of the <br />Permitted Facility, shall b pa for or repaired at the expense of the <br />Permittee. <br />This Permit shall be evocabl in the event of no mpliance of any <br />terms, requirements conditio ,and specifcatio hereof upon written <br />notice given to Per rttee and r owner of reco <br />INDEMNIFICATION: Permittee covenants and agrees to atoll times <br />protect, indemnify, hold harmless, and tlefend Grantor, its officers, <br />agents or employees, from any liability or expense, including attorneys' <br />tees, arising from claims asserted by any person or persons for personal <br />injuries, death or property damage including but not limited to employees <br />of the Permittee or its contractors, subcontractors or their employees, <br />.arising from or growing out of the construction, existence, maintenance, <br />operation or removal of the Permitted Facility. <br />ENVIRONMENTAL AND SAFETY IAWS: Permittee shallcomply with <br />all federal, state, and local laws, rules and regulations, agency policies, <br />guidance documents or common law including, but not limited to, those <br />related to safety or p ollution or p rotection of the p ublic h ealth a nd the <br />environment that govern the emission, discharge, release, manufacture, <br />processing, distribution, use, treatment, handling. storage, disposal, or <br />transportation of hazardous or non-hazardous substances, materials, <br />pollutants, contaminants, chemicals, and/or waste. <br />COMPANY: <br />By: <br />I acknowledge that I am authorized to execute this Encroachment Permit <br />for the above stated entity and that I have carefully read the <br />requirements, terms and conditions of this Permit. I also understand the <br />provisions and prescribed penalties as provided under the laws <br />regarding excavation. <br />By: <br />ERMI EE <br />