Laserfiche WebLink
a <br />M N <br />0 � <br />o . <br />a m n <br />N m <br />i <br />N in O <br />I <br />OHO <br />a rn I <br />U NQQ <br />d � V <br />o n o y <br />Z a c <br />L <br />B <br />9950---1 <br />tii e <br />Li <br />Li <br />w <br />w <br />0 9750 <br />a <br />J <br />W <br />9650 <br />9550 <br />9450 <br />10300 <br />I[6P • G <br />10100 <br />10000 <br />w <br />w <br />w <br />a <br />w <br />J <br />W <br />970C <br />Collis <br />ti 11 <br />Al <br />10400 <br />0 200 400 600 800 IUUU 1Zuu I+UU louu IUUV - -- <br />HORIZONTAL OFFSET (FEET) Scale in Feet <br />A SECTION A —A' MMMEMOMR <br />0 50 100 200 <br />100 feet <br />PERMANENT <br />0 200 400 600 <br />HORIZONTAL OFFSET (FEET) <br />:// <br />B9 <br />— 9950 <br />B SECTION B —B' Scale in Feet <br />0 50 100 200 <br />1 1 1" = 100 feet <br />ENGINEER'S STAMP NO. REVISION DESCRIPTION THIS DRAWING IS NOT APPROVED <br />UNLESS LAST REVISION IS RAND <br />9w el <br />w <br />w <br />W <br />9750 0 <br />a <br />w <br />9650 <br />9550 <br />9450 <br />10000 <br />Uwe] <br />w <br />w <br />w <br />z <br />0 9800 <br />> <br />w <br />J <br />w <br />9700 <br />C <br />HIGH VOLUME SOLUTION <br />COLLECTION SYSTEM RISERS <br />SEE DRAWING 23 <br />1� <br />—1.6 <br />PHASE IV ORE <br />(DESIGN BY OTHERS) <br />20' PSSA PERIMETE <br />ACCESS ROAD <br />20' CONSTRUCTIO <br />A ACCESS ROAD <br />20 C <br />REGRADED 20 <br />PHASE III PHASE IV PSSA <br />ORE <br />9600 <br />EXISTING PHASE III <br />GEOMEMBRANE <br />DATE I BY <br />PERMANENT DIVERSION CHANNEL <br />EASTERN ACCESS ROAD- <br />20' CONSTRUCTION <br />ACCESS ROAD � <br />20' PSSA PERIMETER <br />ACCESS ROAD <br />25 <br />0 200 400 600 <br />HORIZONTAL OFFSET (FEET) <br />C SECTION C —C' <br />11 <br />AP'VD1 NO. I REVISION DESCRIPTION �g SRAWIN REVISION NOT AP sPROVE WRITTEN <br />DATE <br />cz a z M%zi <br />7/26/01 MRJ GE JFL <br />7/10/01 GSL GE JFL <br />2/16/01 SFD GE JFL <br />6/9/00 MRJ GE GE <br />5/25/00 MRJ GE GE <br />Permit #:�_ 8_ <br />Class: ay 1 Confidental?: �Q <br />From C <br />Type .- <br />Doc. Name: To: <br />Doc. Date (if no date stamp): <br />I �1 <br />2 <br />1 <br />22 EXISTING GROUND SURFACE <br />800 <br />Scale in Feet <br />0 50 100 <br />1" = 100 feet <br />BY CHKD AP'VD <br />DATE <br />200 <br />C' <br />r • 10000 <br />••11 <br />CJ <br />w <br />W <br />9800 0 <br />a <br />w <br />9700 <br />••11 <br />9500 <br />1000 <br />CLIENT <br />PRINT ISSUE RECORD <br />LEGEND <br />10300 <br />10200 <br />10100 <br />10000 <br />w <br />w <br />w <br />9900 0 <br />w <br />9500 <br />— — — — — — — EXISTING GROUND SURFACE <br />EXISTING VLF COMPOSITE LINER <br />PROPOSED PHASE IV COMPOSITE LINER <br />NOTES RECEIVE[) <br />SEP p.7 ?ng� <br />1. TOPOGRAPHY PROVIDED BY WESTERN STATESD§'41V►dHl�q`�SIN BASE <br />ON TOP OF SOIL LINER FILL AS —BUILT SURVEY FOR PH�S p1?olty & <br />1999 PHASE III. ALL OTHER AREAS WERE BASED ON FEBRUARY <br />1998 AND DECEMBER 1999 GROUND SURVEYS AND THE 1998 <br />AERIAL SURVEY. 2000 PHASE III AND PROPOSED PHASE IV <br />REGRADING PLAN IS DEVELOPED BY COLDER ASSOCIATES INC. <br />2. PHASE IV ORE SIDE SLOPES SHOWN REFLECT SIDE SLOPES DURING <br />OPERATIONS. <br />3. EXISTING PHASE III ORE SHALL BE REGRADED TO ACHIEVE SLOPES <br />SHOWN. <br />CC Cripple Creek & Victor Gold Mining Company <br />gV Cresson Project <br />DATE tee. A Joint Venture — AngloGold (Colorado) Corp., Manager <br />TITIE <br />44 UNION <br />PHASE IN <br />VALLEY LEACH FACILITY CROSS SECTIONS <br />DRAIIN GSL DATE MAY, 2000 <br />CHECKED JFL JOB No. 003 -2142 <br />It,.Golftr REVIEWED JFL DIGITAL N0' D033 <br />APPROVED JFL <br />scALe AS SHOWN Dwc 1R11V #/n�\ <br />SUITE 500, LAKEWOOD, COLORADO 80228 FILE N0. L <br />instoan_n� r, PAY. tsnMOR° -2nNn 2142D033 1•I <br />RPDo'REGIs 11/'''.. <br />A <br />�0�� .O•N F. (•••T i'i'i <br />• (/p•, <br />o ; 287 _ <br />® <br />2002 RECORD DRAWING <br />o ••��/�Z ��`�,� <br />WIDEN ACCESS ROADS TO 20' <br />Q <br />NpLE, <br />REVISED, RE— ISSUED FOR CONSTRUCTION <br />REVISED, RE- ISSUED FOR CONSTRUCTION <br />01 <br />IF THE ABOVE BAR DOES <br />00 <br />ISSUED FOR CONSTRUCTION <br />QA <br />ISSUED DRAFT <br />NOT SCALE I INCH THE <br />DRAWING SCALE IS ALTERED <br />9w el <br />w <br />w <br />W <br />9750 0 <br />a <br />w <br />9650 <br />9550 <br />9450 <br />10000 <br />Uwe] <br />w <br />w <br />w <br />z <br />0 9800 <br />> <br />w <br />J <br />w <br />9700 <br />C <br />HIGH VOLUME SOLUTION <br />COLLECTION SYSTEM RISERS <br />SEE DRAWING 23 <br />1� <br />—1.6 <br />PHASE IV ORE <br />(DESIGN BY OTHERS) <br />20' PSSA PERIMETE <br />ACCESS ROAD <br />20' CONSTRUCTIO <br />A ACCESS ROAD <br />20 C <br />REGRADED 20 <br />PHASE III PHASE IV PSSA <br />ORE <br />9600 <br />EXISTING PHASE III <br />GEOMEMBRANE <br />DATE I BY <br />PERMANENT DIVERSION CHANNEL <br />EASTERN ACCESS ROAD- <br />20' CONSTRUCTION <br />ACCESS ROAD � <br />20' PSSA PERIMETER <br />ACCESS ROAD <br />25 <br />0 200 400 600 <br />HORIZONTAL OFFSET (FEET) <br />C SECTION C —C' <br />11 <br />AP'VD1 NO. I REVISION DESCRIPTION �g SRAWIN REVISION NOT AP sPROVE WRITTEN <br />DATE <br />cz a z M%zi <br />7/26/01 MRJ GE JFL <br />7/10/01 GSL GE JFL <br />2/16/01 SFD GE JFL <br />6/9/00 MRJ GE GE <br />5/25/00 MRJ GE GE <br />Permit #:�_ 8_ <br />Class: ay 1 Confidental?: �Q <br />From C <br />Type .- <br />Doc. Name: To: <br />Doc. Date (if no date stamp): <br />I �1 <br />2 <br />1 <br />22 EXISTING GROUND SURFACE <br />800 <br />Scale in Feet <br />0 50 100 <br />1" = 100 feet <br />BY CHKD AP'VD <br />DATE <br />200 <br />C' <br />r • 10000 <br />••11 <br />CJ <br />w <br />W <br />9800 0 <br />a <br />w <br />9700 <br />••11 <br />9500 <br />1000 <br />CLIENT <br />PRINT ISSUE RECORD <br />LEGEND <br />10300 <br />10200 <br />10100 <br />10000 <br />w <br />w <br />w <br />9900 0 <br />w <br />9500 <br />— — — — — — — EXISTING GROUND SURFACE <br />EXISTING VLF COMPOSITE LINER <br />PROPOSED PHASE IV COMPOSITE LINER <br />NOTES RECEIVE[) <br />SEP p.7 ?ng� <br />1. TOPOGRAPHY PROVIDED BY WESTERN STATESD§'41V►dHl�q`�SIN BASE <br />ON TOP OF SOIL LINER FILL AS —BUILT SURVEY FOR PH�S p1?olty & <br />1999 PHASE III. ALL OTHER AREAS WERE BASED ON FEBRUARY <br />1998 AND DECEMBER 1999 GROUND SURVEYS AND THE 1998 <br />AERIAL SURVEY. 2000 PHASE III AND PROPOSED PHASE IV <br />REGRADING PLAN IS DEVELOPED BY COLDER ASSOCIATES INC. <br />2. PHASE IV ORE SIDE SLOPES SHOWN REFLECT SIDE SLOPES DURING <br />OPERATIONS. <br />3. EXISTING PHASE III ORE SHALL BE REGRADED TO ACHIEVE SLOPES <br />SHOWN. <br />CC Cripple Creek & Victor Gold Mining Company <br />gV Cresson Project <br />DATE tee. A Joint Venture — AngloGold (Colorado) Corp., Manager <br />TITIE <br />44 UNION <br />PHASE IN <br />VALLEY LEACH FACILITY CROSS SECTIONS <br />DRAIIN GSL DATE MAY, 2000 <br />CHECKED JFL JOB No. 003 -2142 <br />It,.Golftr REVIEWED JFL DIGITAL N0' D033 <br />APPROVED JFL <br />scALe AS SHOWN Dwc 1R11V #/n�\ <br />SUITE 500, LAKEWOOD, COLORADO 80228 FILE N0. L <br />instoan_n� r, PAY. tsnMOR° -2nNn 2142D033 1•I <br />