Laserfiche WebLink
Page 2 of 2 <br /> Project: Oxbow Mining Hole: EC-7 <br /> <br />• From To Thick. Description <br /> <br /> 0.00 5.00 5.00 S6il: silty loam, brown <br /> 5.00 6.00 1.00 Clay: Ight yellow ray, 10% rock hagments <br /> 6.00 6.50 0.50 Boulder Sandstone: firm <br /> 6.50 7.00 0.50 Soil: silty loam, brawn <br /> 7.00 9.00 2.00 Soil: clayey loam, damp <br /> 9.00 20.00 11.00 Boulder Sandstone: fine, clay laminae mats <br /> 20.00 25.00 5.00 Sandstone: Ightgvay-yellow, very fine grained, weathered <br /> 25.00 TD Static water ®11'. <br /> Hole completed as Hz0 Nbnitoring Well <br /> OD of hole: 3.75" <br /> OD of pipe: 2-3/8" PVC Sch. 80 flush Joint <br />• ID of pipe: 2" <br /> Completion Data: <br /> 3 - 0 2" PVC Riser Pipe (stickup) <br /> 0 - 15' 2" PVC Riser Pipe <br /> 15 - 25' 2" PVC Well Screen (0.020") <br /> 0 - 1' Cement <br /> 1 - 8' Bentonite Chips <br /> 8 - 25' Sand Pack (0.035") <br /> <br />