My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126665
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:51 PM
Creation date
11/25/2007 3:43:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004029
IBM Index Class Name
Permit File
Doc Date
5/24/2004
Doc Name
Response
From
SEO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources cF_cor <br />,~E_`~ ~q <br />Department of Natural Resources IyQ/ ~~11 <br />1313 Sherman Streel, Room 818 \~ ~" <br />~ <br />Denver, Colorado 80203 ~ ~69e s~ <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br /> Bill Owens <br />www.watecstate.co.us Governor <br /> Response to Reclamation Permit Application Consideration Russell George <br />Executive Director <br /> Hal D. Simpson, P.E. <br /> State Engineer <br />DATE: May 24, 2004 <br />TO: Berhan M. Keffelew, Environmental Protection Specialist RECEIV <br />E <br />D <br />CC: Division 2 Office; District 12 water commissioner ~y <br />~, <br />MAY 2 ~ .~ <br /> <br />FROM: Don West, P.E. <br /> Giuision of Minerals and Gealogt <br />RE: AZCO Pit, File No. M-2004-029 <br /> Operator: AZCO Construction <br /> Contact: Ron Walker <br /> Section 17, Twp 175, Rng 73 W, 6th P.M., Fremont County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. Applicant states that stormwater will be <br />contained on-site. Al] ponded stormwater must infiltrate into the ground or be released to the <br />natural stream system within 72 hours, or all work must cease until a substitute water supply plan, or <br />augmentation plan approved by water court, is obtained. Reclamation plans must ensure water will <br />not be retained onsite for more than 72 hours unless an augmentation plan approved by water court <br />is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a pelmit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.