Laserfiche WebLink
<br />EXHIBIT H: Reclamation Costs <br />As shown on Figure 4, new surface disturbances will be <br />less than one-teni:h (0.10) of an acre. Future land use will <br />be a forest fire fighting base station, utilizing the dump area <br />and road access. The dump already supports wild raspberries, <br />and reseeding will not be necessary. Reclamation costs are <br />hence estimated to be nil, and no reclamation bond would be <br />needed. <br />