Laserfiche WebLink
EXHIBIT L -RECLAMATION COSTS <br />Following is an estimate of reclamation costs. Bear in mind that this estimate is based on today's cost and <br />is subject to inflation and economic fluctuations. Changes and revisions as a result of the review process <br />to the accompanying reclamation plan may also affect the total cost. <br />COLE GRAVEL PIT <br />Equipment: Dozer 8 Scraper Avg. Push Grade: 77°~ Avg. Push Distance: 35 <br />Avg. Haul Grade: 1% Avg. Haul Distance: ~~ <br />ITEM DESCRIPTION UNIT QUAN. PRICE TOTAL <br />1 Mobilization <45 mi. EA 7 $ 1,000.00 $ 7,000.00 <br />2 Erosion Control Blanket SY 40,875 $ 2.00 81,750.00 <br />2 Embankment CY 5,310 $ 2.00 10,260.00 <br />3 Rip Pit Floor 2 ft. AC 189 $ 250.00 47,250.00 <br />4 Place Top Soil CY 161,100 $ 1.50 241,500.00 <br />5 Seed, Mulch, and Tack <br />TYPE "A" AC 194 $ 100.00 19,400.00 <br />6 Seed, Mulch, and Tack Fertilize <br />Side Slo es TYPE "B" AC 5.5 300.00 1,650.00 <br />6 "Biosol" Fertilizer AC 199.5 385.00 76,808.00 <br /> Subtotal $414,320.00 <br />7 Indirect Costs LS 24,860.00 <br /> Subtotal 439,180.00 <br />8 Project Management LS 17,570.00 <br /> TOTAL $456,750.00 <br />NOTE: <br />APPROXIMATELY 30,000 TONS OF CONCRETE RUBBLE IS INCLUDED W RHIN ITEM 2, SLOPES OF EACH PHASE. HAUL <br />AND PUSH DISTANCES FOR RUBBLE ARE INDICATED ABOVE. <br />Rev. 05118/04 <br />