Laserfiche WebLink
1 <br />t <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />EXHIBIT E <br />F2ECLAMAT I ON F}LAN <br />Wa11;er F'it North was disturbed from previous mining perat.ic;r~s <br />appro.:imately 10 years ago. The total of the previou[ ~~stv.r- <br />bance is appro::imately 1.0 acres. Future operations will ~ii._:P.ui-i:~ <br />9.9 acres, which includes the 1 acre relic mine. The i-iaua r..:~ar.i <br />will comprise .14 acre. There will be no topsail stoclpil~s. <br />After mining, the pit sides will be yrc{ded to a ma>:.iinu <br />~h:.lv. The post mine level of I-.he pit bottom for i.Y,ie, <br />be at the same elevation as the seasonal high water mar <br />L"reek. In the event Clay CreeF:: Flooded, the pii area <br />].i4;ely become part of the floodplain. The signifir_anr.: <br />an occurrence will depend on t:he ground cover press:-~ <br />disturbed area. The vegetation establ:i=_,hed thror_rgh th <br />reclamation procedures will provide a roughened surfac <br />of slowing water- flow and the scouring action ass;oci <br />flood events. by physically disrupting overland flow <br />sediment deposition will be enhanced, effectively ret~~ <br />loss. <br />The haul road diverges off an e:;isting oil well accr <br />This SOU foot haul road r_onstructed in response to the <br />Wa14::er North mine, will be reclaimed. See Reclamat_ir <br />Sheet ^c of ~ in the pocF::et at the end of this report. <br />The followir-rg seed ini;: will be used in reclamation. <br />*Rate - <br />lbs. F'LS/ Seeds/ <br />acre ft.' <br />buffalograss 6.7 7 <br />blue grama grass CJ.7 1 <br />Alkali sacaton o.'? 9 <br />Little bluestem 1.~ 6 <br />Sandberg bluegrass C+.4 8 <br />Cicer mil4:vetch 18 6 <br />o r' i i..:, y <br />i~id .....si.. <br />i •I'1 ~.. I'i E? <br />o~.rtl inc~c.1 <br />~apab.i.e <br />e d 4J 1 '1'. I'l <br />f r•Jater. <br />ing sail <br />,__ road. <br />proposed <br />i Nap on <br />F'erc nt of <br />mi ft.= <br />1 .J <br />1 .5 <br />1 .:~ <br />1 <br />11.0 48 lii <br />' *Drilled, if broadcast double the amount <br />The outlined revegetation procedures will ta4::e place irn <br />' following snow melt, thereby assuring optimal moistr_rre c <br />for germination. Using this timetable, the soil moistu <br />and plant dependency on water will decline simultaneousl <br /> <br />0 <br />ediately <br />editions <br />e supply <br />E-1 <br />