Laserfiche WebLink
- zo - <br /> <br />4.0 DESIGPI RECOMMENDATIONS, UPGRADED HAUL ROAD <br />4.1 GENERAL <br />We were provided with a set of drawings titled "Munger <br />i <br />Canyon Haul Road" dated July, 1979. This set of drawings <br />identified a tentative alignment of the road that would improve <br />the alignment of the existing gravel road. we have used this <br />alignment for the evaluation of the feasibility of the recom- <br />mended changes. <br />4.2 HAUL ROAD ALIGNMENT <br />The improved haul road alignment has been selected so <br />that numerous sharp curves of the existing road are eliminated. <br />To achieve a significant improvement of the road parameters, <br />the alignment has been generally shifted toward the south at <br />locations where cuts are required and toward the north at the <br />location where fills are required. <br />Such a solution would generally result in increased heights <br />of the road cuts and in the construction of several fills at <br />locations where important gulches would be crossed by the haul <br />road. <br />• <br />