My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126332
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:34 PM
Creation date
11/25/2007 3:17:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Permit File
Doc Date
1/13/1992
Doc Name
ADEQUACY LETTER ZMK MINE CONSTRUCTION INC ZMK GRAVEL PIT FN M-91-146
From
MLRD
To
MONADNOCK MINERAL SERVICES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />5. Your mining plan includes changing the course of the Uncompahgre <br />River. Provide evidence that altering the course of the river will nnr <br />Q ~~~ cause off-site damage such as steam bank ernc;nn n properties upstream <br />6,~~ y/ an owns ream f=rom the ^r.~pa~P~ ~~p a~o11. Your response to tTiis <br />~~.q~~- c~izen concern was that it will be addressed in your 404 permit <br />d ~'~je~ application. The Mined Land Reclamation Act CRS 34-32-116(7)(h) also <br />requires that you address this matter in your Reclamation Permit <br />application. Provide maps, data and calculations developed by an i <br />engineer or hydrologist versed in stream mechanics that demonstrate <br />~(-~^ that off-site damage will not occur as a result of the proposed hannel I~ <br />/ ` change. / L / // <br />'~(~, L<a .'l' ~Y / fi• 1.=r.~y- ~; vita se , /~ s I ~- f Yt°/ r .u,,,~rJ~ <br />1frf6. ~~When tfije r~ve~r is~iverted into tFie Phas I pit area, some stor of orY , <br />iv.i~~ ~~' water will occur before the normal river flow is resumed. Provide ~~''~'~e~ <br />a ~ ~ <br />evidence that this will not constitute injury to existing water rights.r%~~ <br />~~ ~ ~~ <br />r <br />e' ok <br />~~~~ <br />~q~ <br />5co~~ C <br />gD~ <br />1 o A~- <br />You have stated that the side boundary to the west of the permitted <br />area will be rip-rapped. Provide specifications for the size, type of <br />material and placement of this rip-rap. These specifications should be <br />sufficient to demonstrate that off-site damage from a 100-year, _ ___ <br />24-hour, storm event will be prevented. <br />Your application states that the 300-foot distance between the <br />disturbed area and the south property line will allow sufficient space <br />for the river to establish its natural gradient without impacting the <br />adjoining property owner. Give evidence of this by providing a report <br />including data and calculations developed by a hydrologist or engineer <br />versed in stream mechanics that shows the direction and extent of head <br />cutting that will occur until the river establishes a stable natural <br />gradient. Provide this same type of evidence for the location and <br />extent of scouring that will occur downstream from the excavations. <br />Show these additional disturbances on your Exhibit E Map. <br />Explain why the east side boundary of the permit area is not planned to <br />be rip-rapped. State why this or some other bank protection will not <br />be necessary to protect the adjoining property from erosion damage <br />during high flows. <br />The Exhibit E Map does not clearly show the extent of planned <br />rip-rte apping. Please show this information on the map. <br />11 Old" Describe how the diverted Uncompahgre River will re-enter the normal <br />river channel at the north end of the Phase I excavation during Phase <br />II operations, and show this on the Exhibit E Map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.