Laserfiche WebLink
I ~ LIS7 OF TABLES TOC-6 <br />VOLUME I <br /> <br />• <br />TABLE NO. TABLE TITLE <br />2.1-i Equipment List <br />2.1-1 Construction and Disturbance Timing <br />2.2-3 Stability Analysis -Line 1 at Station 103+00 <br />2.2-4 Stability Analysis -Line 2 at Station 97+00 <br />2.2-5 Stability Analysis -Line 3 at Station 90+00 <br />2.5-1 Surface and Ground Water Monitoring <br />2.5-2 Water Quality Monitoring <br />2..5-3 Flow Rating Charts Munger Canyon <br />3.3-1 Depth of Suitable Topsoil Material Available <br />3.3-2 Volumes of Material to be Salvaged Along Road Alignment <br />3.3-3 Volumes of Material to be Salvaged in the Waste Rock Disposal Area <br />3.3-4 Chemical Analysis of Surface Layer at Mine Site <br />3.4-ia Juniper Woodland Seed Mixture <br />3.4-1b Big Sagebrush Shrubiand Seed Mixture <br />3.4-1c Greasewood Shrubland Seed Mixture <br />3.7-1 Reclamation Costs <br />3.7-2 Reclamation Timetable <br />3.9-1 Reclamation Costs for Prelaw Disturbance <br />3.9-2 Calculation of Earthwork Volumes for Reclamation of Prelaw <br />Disturbance <br />3.9-3 Hydrology Calculations for Reclamation of Prelaw Disturbance <br />3.9-4 Stability Analysis for Reclamation of Prelaw Disturbance <br />4.1-1 Test Pit T P 1 <br />4.1-2 Test Pit T P 2 <br />4.1-3 Test Pit T P 3 <br />4.1-4 Test Pit T P 4 <br />4.1-5 Test Pit T P 5 <br />4.2-1 Core Laboratories Analytical Report -Roof and Floor <br />4.2-2 Drill Hole Information Summary , <br />4.2-3 Coal Mine Waste Geochemical Data <br />M" <br />9/02 <br />