Laserfiche WebLink
TOC - l l <br />2.2-13 Mine Site Profiles <br />• 2.2-14 Mine Site Plan <br />2.2-15 Loma Rail Loadout <br />2.2-17 <br />Thru Munger Haul Road Plan & Profile @ 1 " = 50 'Scale <br />2.2-23 <br />2.2-24 Munger Haul Road Typical Cross Sections For 1" = 50' Maps <br />VOLUME III <br /> 2.3-I Surface Water Control Systems <br /> 2.3-2 Permanent Diversion -Typical Section D-D <br /> 2.3-3 Permanent Diversion -Typical Section E-E <br /> 2.3-4 Surface Hydrology Map <br /> 2.3-5 Sampling Locations & Water Quality Monitoring Program <br /> 3.1-I Reclamation Plan Map <br /> 3.1-2 Prelaw Disturbance Reclamation Plan -Existing Configuration - 1" = 50' <br />• 3.1-3 Prelaw Disturbance Reclamation Plan -Existing Configuration - I" = 50 ' <br /> 3.1 ~ Prelaw Disturbance Reclamation Plan -Existing Configuration - 1" = 50 ' <br /> 3.1-5 Prelaw Disturbance Reclamation Plan -Reclaimed Configuration - 1" = 50' <br /> 3.1-6 Prelaw Disturbance Reclamation Plan -Reclaimed Configuration - 1" = 50 ' <br /> 3.1-7 Prelaw Disturbance Reclamation Plan -Reclaimed Configuration - 1" = 50' <br /> 3.1-8 Prelaw Disturbance Reclamation Plan -Haul Road Cross Sections & Stability <br /> 3.1-9 Prelaw Disturbance Reclamation Plan -Mine Site Cross Sections & Stability <br /> 3.1-10 Lower Road Reclamation <br /> 3.1-11 Reclamation Drainage Basins <br /> 3.6-1 Mine Portal Seal <br /> 3.6-2 Sealing Plan Schematic <br /> 4.1-1 Land Use Types <br /> 4.1-2 Preliminary Alluvial Valley Floor Identification <br /> 4.1-3 Log M W - 1 <br /> 4.1-4 Log M W - 2 <br /> 4.1-5 Log M W - 3 <br /> 4.1-6 Log M W - 4 <br />M" Volume I Original Permit 12 - 18 - 96 <br />