Laserfiche WebLink
\\\ • <br />MINED LANs, .~ <br />Depanrr7ertt of Natural Resw.., _ <br />t373 Sherman St.. Room 275 <br />Denver. CO 80203 <br />303 666-3567 <br />Fax 303 832-Bt06 <br />III III IIIIII IIII III <br />• <br />~4 <br />„~/~ i8 <br />~': . <br />rg 76 <br />~f Rom. <br />Gaerrin <br />May 22, 1590 FredR Banta. <br />Unsgn UrMOr <br />James J. Goode and William K. Goode <br />Blasting 8 Mining, Inc. <br />P.0. Box 656 <br />Cortez, CO 81321 <br />Re: M-90-025, Gardner Pit No. 2, Permit Issuance <br />Dear Messrs. Goode and Goode: <br />On May 22, 1990, the Mined Land Reclamation Division found Blasting 8 Mining, <br />Inc. to have satisfied the applicable requirements of C.R.S. 34-32-101 et seq. <br />for obtaining a mining and reclamation permit. Therefore, a permit is teeing <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. _ <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, May 22, you must submit an <br />annual report and an annual fee to us. The annual fee for this permit is <br />E50.00. Please consult Rule 3.4 for 110 Permits, Rule 2.4 for 112 Permits, <br />and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific annual <br />report requirements applicable to your mine. <br />if you have any questions, please contact me. <br />Si nce~-e , <br />~~ " ~ ~~>\ <br />FRED R. BANTA ~~ <br />Director <br />Enclosure <br />7545G <br />