My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126273
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:31 PM
Creation date
11/25/2007 3:11:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
8/27/2004
Section_Exhibit Name
NH2 Section 2.05.3(3) Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These small ponds will not need to be reclaimed as each pond will be absorbed by the advancing <br />• pit. In addition, a new "traveling" pond will be installed just prior to the topsoil removal campaign <br />that moves ahead of the existing SAE pond. <br />Using the scenario above and fora 25-yr 24-hr event, Table Att 2.05.3(3)7-1 shows the disturbance <br />details and run-off volumes for the annual topsoil disturbance for years 2003 through 2008. This <br />"traveling" pond procedure will be repeated in the 2008 to 2013 Permit renewal until the coal pit <br />passes to the west of the Pond 010 proposed location sometime in 2013. Then, since the coal pit <br />wilt no longer function as a sediment control device, Pond 010 will be built. Map 2.05.3(3) shows <br />the drainage basin for Pond 010. <br />The SEDCAD4 engineering hydrologic runoff calculations for the Small Areas Exemption and the <br />"Traveling "Pond areas can be reviewed in Attachment 2.05.3(3)-7. The above alternative <br />sediment control techniques will meet all applicable state and federal effluent limitations. The area <br />exemption effectiveness will be demonstrated by computer simulation or real-world event sampling. <br />Discharge Structures <br />Discharge from the sedimentation pond, diversions and pit dewatering will be controlled by energy <br />dissipaters, riprap channels, and other means or devices, where necessary, to reduce erosion, to <br />prevent deepening or enlargement of stream channels, and to minimize disturbance of the <br />hydrologic balance. Discharge structures will be designed according to standard engineering <br />design procedures. <br />Transaortation Facilities <br />Haul Roads. The following describes the design and construction of haul roads at the New Horizon <br />Mine. <br />General Reouirements. WFC will construct, maintain and reclaim haul roads to minimize <br />erosion and siltation, air and water pollution and damage to public and private property. To the <br />extent possible, using the best technology currently available, haul roads will not cause damage to <br />• (Revises ~/zoos) 2.05.3(3) - 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.