Laserfiche WebLink
<br />EXHIBIT B - Mining Plan <br />Existing topsoil (0"-6" thick) is removed and stock- <br />giled. <br />The mining operation will include excavatine pit . <br />material with track type dozers,_and pushing the material <br />to 3 to 7 cu.yd. rubber tire 1~ s. The loaders will <br />in turn feed a portable jaw crusher nd secondary cone <br />crusher. After the various u are made, they <br />will be stored in stockpiles in the old pit area. <br />There are no water diversions or impoundments. <br />The size of the area to be worked at any one time is <br />impossible to determine because several different <br />products will be made at this site, some of them not <br />being immediately used. Since there will be stockpiles <br />and since different materials will be.made at various <br />times, the arrangement of product conveyors and stackers <br />will vary from time to time, thus changing the basic <br />plant layout and in turn changing the areas readily <br />available for excavation. <br />A timetable for this project would be difficult to <br />determine since operations are intermittent and directly <br />subject to the demands of material needed by local <br />county and city governments and the Colorado State <br />Highway department. <br />~~ ~ ~~a ~ s~~~~ <br />~~~~~ <br />