Laserfiche WebLink
CATERPILLAR INC. <br />FLEET PRODVCTION AND COST ARALYSIS <br />I <br />TOPSOIL REDISTRIBUTION COSTS FOH HO LOADOUTi FACILITIES & RAILROAD <br />BAYDEN 6VLCH TOPSOIL H6 TERM INC 16-JAN-96 Page - 7- <br />HAUL - Travel Time 8 Spends <br />HAYDBN GULCH TOPSOIL <br />Courae Course <br />~ Material Density Lbs per Initial <br />Nema Dasc Qty TONS LCY BCY Spend <br /> H <br />LOOP6FAC TS PAC/LOOP 61,677 2,021 2,021 2.00 <br />Bmpty Wt., TONS 56.06 Payload, TONS 30.00 Code C134 <br />HAULER 6378 <br />ID <br />Tires 37.25-35 <br />Tpps E3 <br />Speed Corr. 1.00 <br />Alt. Corr.. 1.00 <br />HAUL Distance Rolling Orade MPH Potential Segment Speed Cumulative <br />3egmeat PERT Resiati 8 Limit Speed Naz at Bad Miautea <br />2,000 5.00 3.00 30.00 15.03 15.03 2.00 1.63 <br />RETURN - Travel Ties & Speeds <br />HAYDEli GULCH TOPBOIL <br /> <br /> <br />Courae Course Material Density Lbs per Initial <br />Nacre Deac Qty TOMB LCY SCY Speed <br /> H <br />LOO86FAC TB FAC/LOOP 61,677 2,021 2,02.1 2.00 <br />Smpty Nt., TONS 56.04 Payload, TOMS 30.00 Cade C136 <br />BAiJLER 637E <br />ID <br />Tires 37.25-35 <br />TYPe B3 <br />Speed Corr. 1.00 <br />Alt. Corr.. 1.00 <br />RETURN Distanoe Rolling Orade MPH Potential: Segment Speed Cumnlative <br />Segaeat FEET Reaist• ~ Liaut Speed Max at End Minutes <br />2,000 5.00 -3.00 30.00 36.02 30.00 2.00 0.91 <br />23-3-39 <br />REVISED Oi/30/96 <br />