1 <br />' 1. sand ad (hsval Opsiaticn <br />' Processing of pit run gravel into epecificatio~n aggregates will occur on site. <br />The crusher plant will be situated at the southwest section of the permitted <br />area. <br />' The source of this pit run will, for the most part, be inaitu materials; however, <br />some excavating and stockpiling will be necessary. 'These activities will still <br />be confined adjacent to the crusher plant site as depicted on the Mining Plan <br />' Map, Exhibit E. <br />The crusher plant is powered by an electrical generator set that is fueled by <br />' diesel fuel. Particular efforts will be made to provide spill contairunent for <br />any diesel fuels that could accidentally be released. <br />' The fuel tank will be situated near to the generator set. An earthen berm will <br />be built around the fuel tank and generator set so as to contain a spill and to <br />prevent any fuel or oil from gainir~t access to the water that is remaining in <br />the bottom of the pit. In the event of a spill, the oil saturated soils will <br />' be entirely roved from the site and deposited at an approved disposal site. <br />The parameters of the operatics shall be that no excavation shall occur nearer <br />' than 30 feet to any adjacent property. A distance of 100 feet will be maintained <br />between any excavation and the shoreline of the Colorado River, which ie adjacent <br />to the site on the east. Excavatia~n will be conducted eo as to facilitate <br />reYsabilitation of the property as detailed in the Reclamation Plan. <br />2. Asphalt Plitt Operation <br />' Production of hot asphalt shall occur at this site; the location of the plant <br />will be as depicted on the Mining Plan Map, Exhibit E. Crushed aagreaates will <br />be stockpiled Sn an area between the crusher plant and the asphalt plant. <br />' Asphalt cement and diesel fuel will be used at this site in the pxoductio~t of <br />hot asphalt. Spill contairmient procedures for these two products shall be <br />followed in a similar fashion ae will be done in the earri and gravel operations <br />for diesel fuels. <br />In addition to spill containment procedures, drainage control will be implemented <br />to divert upland drainage away from the asphalt plant area and to prevent <br />inmediate run-off fran this site into the Colorado River or the lake area. This <br />drainage control will be in the form of grader ditdves axrnmd the plant site <br />perimeter. <br />-8- <br />