My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126145
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:25 PM
Creation date
11/25/2007 2:56:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section - 2.05.4 <br />fences, etc.) until effective drainage can be reestablished. Any berms constructed to contain small <br />drainage areas will be revegetated and left in place. The vegetative cover will help to stabilize the <br />berms and over time the area on the uphill side of the berms will silt in completing the reclamation <br />process. Regrading operations will be limited to existing disturbance areas and those immediately <br />adjacent undisturbed areas necessary to provide for effective blending of regraded surfaces with the <br />surrounding terrain. Fugitive dust emissions will be controlled during reclamation by periodic <br />watering of roads and active redamadon areas. <br />Soil materials will be sampled following replacement to verify suitability and will be stabilized by <br />leaving the surface of the replaced soil in a roughened condition to minimize surface runoff and <br />erosion and promote moisture infiltration and through application of straw or native hay mulch <br />following seeding. <br />TABLE 2.05.4-T1 <br />SURFACE DISTURBANCE SUMMARY <br />Area Disturbance Reference <br /> (acres) Drawing <br />Elk Creek Coal Handling, Support, and Ancillary 39.0 Map 2.05-M1, General Facilities <br />Facilities Exhibit 2.05-Ei, Facilities Details <br />Sanborn Creek Mine Surface Facilities 4.7 Map 2.05-M1, General Facilities <br /> Exhibit 2.05-E7, Facilities Details <br />West Valley Coal Refuse Facility and Haul Road 12.9 Map 2.05-M1, General Facilities <br /> Exhibit 2.05-E4, Mine Development <br /> Rock/Coal Refuse Facility <br />Elk Creek Mine Surface Facilities 24.2 Map 2.05-M1, General Facilities <br />lof total 8.6 is new and 15.6 is existing) Map 2.05-M3, Facilities Details <br />II West Coal Refuse Facility 8.8 Map 2.05-M1 General Facilities <br /> Exhibit 2.05-E4, Mine Development <br /> Rock/Coal refuse Facility Designs <br />Satellite Facilities <br />Upper Hubbard Creek Facilities Area 3.3 Map 2.05-M1, General Facilities <br /> Map 2.05-Et, Facilities Details <br />Lower Hubbard Creek Facilities Area 2.6 Map 2.05-M1, General Facilities <br /> Map 2.05-E1, Facilities Details <br />Hubbard Creek Power Line Road 0.7 Map 2.05-M1, General Facilities <br /> Exhibit 2.05-E7 Facilities Designs <br />Bear Creek Facilities Area 3.0 Map 2.05-M1, General Facilities <br /> Exhibit 2.05-Et, Facilities Details <br />Water Treatment Plant Area 1 .5 Map 2.05-M1, General Facilities <br />Sewage Effluent Absorption Field 0.3 Map 2.05-M1, General Facilities <br />Substation No. 3 and C-Gulch Ventilation 1.6 Map 2.05-M1, General Facilities <br />Installation <br />Coal Gulch Exploration Sites 0.4 Map 2.05-M1, General Facilities <br />Powerline Roads 17.0 Map 2.05-M1, General Facilities <br />Degas Well Sites ICBM-1- 151 and Roads 7.1 Map 2.05-M1, General Facilities <br />Elk Creek Mine Gob Vent boreholes and roads. 17.18 Map 2.05-Mt, General Facilities <br />Subtotal -Satellite Facilities 54.68 Map 2.05-M1, General Facilities <br />Total 143.68 <br />Soil samples will be analyzed Eor the parameters of pH, acid-base potential, saturation percent, <br />electrical conductivity, sodium adsorption ratio, selenium, boron, texture, nitrogen, phosphoms, and <br />potassium. Any necessary application of soil supplements or fertilizer will be based on soil analysis <br />results. <br />Revegetadon success will be determined based on the results of revegetation monitoring. <br />Revegetation monitoring for reclaimed areas will occur in the third ox fourth, ninth, and tenth year <br />following permanent seeding. In general, ievegetation success will be evaluated based on the <br />parameters of cover, production and diversity by comparing monitoring data from reclaimed areas <br />and corresponding vegetation reference areas. The revegetation monitoring schedule, a description of <br />monitoring and evaluation methods, and revegetation success criteria are detailed in the revegetation <br />plan included in Exhibit 2.05-E6, Vegetation Information. <br />TR-54 2.05-SOa Revised Apri12006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.