Laserfiche WebLink
<br /> <br />EXHIBIT E MINING PLAN MAP <br /> <br />TOPSOIL WILL 'BE STRIPPED AND STOCKPILED ON THE EASTERN EDGE OF <br />THE PIT. <br />STOCKPILE SLOPES WILL BE NO GREATER THAN 3H:1V. <br />TOPSOIL IS APPROXIMATELY 10" DEEP AND APPROXIMATELY 7500 CUBIC <br />YARDS WILL BE STOCKPILED. <br />GENERAL DIRECTION OF MINING WILL BE NORTH TO SOUTH AND DEPTH <br />WILL BE 5-10'. <br /> <br />o y~S~ i~L:.,,,e <br />TOPSOIL/OVERBURDEN <br />STOCKPILE <br />y1 I, ~. ?i ~ ~~l <br />+- / <br />15~ <br />^~ <br />1V <br />r---i <br />~ "= f U0 <br />