Laserfiche WebLink
• Tahle TR 90-06-4 <br />(continued) <br />SEDIMENTATION POND "M3-S" - DESIGN CALCULATIONS <br />Equivalent Peak Discharge (cfs @ 151.0 cfs/inch runoff) <br />10 year-24 hour 64.93 <br />25 year-24 hour 90.60 <br />100 year-24 hour - 151.00 <br />Actual Peak Discharge (cfs) <br />10 year-24 hour 62.30 <br />25 year-24 hour 86.93 <br />100 year-24 hour 144.88 <br />Runoff Volume (acre-feet) <br />10 year-24 hour ~ 6.81 <br />• Universal Soil Loss Equation Parameters <br />Rainfall Factor (R) 30 <br />Soil Erodibility Factor (K) 0.32 <br />Topographic Factor (LS) 13.75 <br />Cover and Crop Management Factor (C) 0.36 <br />Erosion Control Practice Factor (P) 1.00 <br />Soil Loss (tons/acre/year) 47.52 <br />Sediment Delivery Ratio C.39 <br />Sediment Yield (tons/acre/year) 18.53 <br />Three Year Sediment Yield (acre-feet @ 80.31bs/ft3) 6.0 <br />Storage Volume (acre-feet) 25.4 <br />• Design Pond Capacity (acre-feet) Cg•2 <br />(based on ;year sediment yield + storage <br />volume l :0 year-24 hour runoff volume) <br />Ma on_nF Exhibit 3 - 21 11/16/90 <br />