My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125987
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:17 PM
Creation date
11/25/2007 2:42:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 3 SEDIMENT CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision 90-06 <br />• The primary outlet structure selected for the ponds is an outlet culvert with a flap valve on <br />the outlet to prevent backflow during spring runoff. The outlet culvert extends through the <br />pond embankment within the impoundment area as shown by the sedimentation pond design <br />maps. The outlet culverts, which are located at the design storage level, are provided to allow <br />gradual discharge of impounded storm runoff. The size of the outlet culverts have been <br />determined so as to allow a minimum detention time of 24 hours. By providing for a detention <br />time of 24 hours or more, any suspended sediment contained in the runoff is allowed to settle <br />out before the water is discharged to the receiving drainage. <br />The emergency spillways for the pond structures are riprap lined broad-crested weirs and <br />outlet channels. The emergency spillway invert elevation is a minimum of 1.0 foot above the <br />primary outlet structure. The primary outlet structures are designed so that any runoff <br />• increment greater than the pond storage volume will overflow through the outlet culvert. In <br />this way, the primary outlet structure supplements the emergency spillway to discharge <br />excess storm runoff. The emergency spillways for Pond M3-S and M3-N have been sized for <br />the 100 year-24 hour and 25 year-24 hour storm events, respectively. The emergency <br />spillways have been sized to provide a minimum of 1.0 foot of freeboard between the <br />maximum anticipated water level for the design storm event and the top of the embankment <br />structure. In addition to the design freeboard, the construction height specifications for the <br />embankment structure have been increased by 5°~ to allow for any possible settlement. <br />The design equations utilized to size the primary outlet structure and emergency spillway are <br />standard hydraulic design equations obtained from the Civil Engineering Handbook, <br />TR 90-06 Exhibit 3-10 Revised 11!16!90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.