My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125976
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:16 PM
Creation date
11/25/2007 2:41:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984156
IBM Index Class Name
Permit File
Doc Date
8/24/1984
Doc Name
LIMITED IMPACT 110 AND SPECIAL TEN DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- ~ . <br />-4- <br />EXHIBIT F - Proof of Compliance with Local Goverrtinent Zoning <br />In accordance with 34-32-115(~1)(e), the Board must make a finding that the operation <br />will oe in compliance with local zoning or subdivision regulations. You are not <br />required to submit this information, but a submission woultl assist the Division's <br />processing of the application. When the Uivisidri notifies the local government of the <br />existence of this application, it will request infornation regarding compliance with <br />applicaole local. law. It is intended that operators .nay concurrently come into <br />compliance with local requirements at the same time the Division is processing this <br />application. lnforination regarding the status with local government will oe helpful. <br />EXHIBIT G - Source of Legal Right-to-Enter <br />This could oe a copy of the leasa, deed, abstract of title, or current tax receipt. An <br />acceptable alternative would be a statement acknowledged by a Notary Public that the <br />operator has the legal right to enter the mine. <br />EXHIBIT H - Reclamation Costs <br />For a 11U perr~rit, if the operator requests financial warranty to be less than $S,000.UU, <br />the operator must suo~r~it facts to support such a request. Uther~wise, a financial <br />warranty of $S,000.UU will automatically oe.set. for all 111 penaits, the financial <br />warranty shall be $2,SOO.UO per acre. <br />EXHIBIT I - Terns of Govern;nental Contracts (111 Applications only) <br />for Special to-Day (111} permits, the operator must submit a copy of the contract or <br />dther proof that proves the necessity of a Special lU-day permit. The operator must <br />_ also suoiniz evidence of the financial warranty provided under tiie governmental contract, <br />if it was required. <br />NOTICE PRUCEUURES <br />After the application is considered "filed" (pursuant to Rule 1.1(lU) with the ~1ined <br />Land Reclamation Division, notice procedures outlined in rule 3.2 and/or 4.2 must be <br />followed. (format for such notices will ae included in the letter ydu receive from the <br />b1LR staff informing you of the Completeness ("filing") of your application.) <br />f INAiJCINL ',JARRAIJTY <br />Prior to permit issuance, proper performance and financial warranty must be received in <br />accordance witVi Rule 7. Please ootain the appropriate form for your chosen method of <br />financial warranty. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.