Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : X04 <br />Date : 08/312005 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Elk Creek Mine <br />Permiujob# : C-1981-022 <br />Abbreviation :none <br />Filename : C022-X04 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Notice of Intent X-2005-223-06 <br />Task description :Replace Topsoil from Stockpile to Drill Pads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosuhour : $51.01 NA <br />Operatingcosuhour : $93.55 100 <br />Ripper op. cosuhour : $0.00 0 <br />Operator wsUhour : $31.78 NA <br />Total unit cosuhour : $176.34 Total fleet cosUhour : $176.34 <br />.:: .. ::: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 650 BCY factor : 1.250 volume : 812 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Conddion Correction Factors Source <br />Average push distance : 85 feet <br />Unadjusted hourly production : 1,405.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (i <br />Average site altitude : 6,500 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Earth - Drv oacked <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />Adjusted unit production : 570.38 LCY/hr <br />Adjusted fleet production : 570.38 LCY/hr <br />Total job time : 1.42 Hours <br />Unit cost : $0.309 /LCY Total job cost : $251 <br />