Laserfiche WebLink
<br />v. RAw MATERIAL <br /> a. <br /> <br />- <br />MATERIAL <br />ROCK <br />COAL oTxER <br />Tons removed per year - 30000 <br />Maximum tons removed per day 1000 <br />Equipment used for removal Dozer ~ Loader <br />Equipment capacity (in tons) Dozer - 14 Ton 6 Loader 4. T <br />Est. hours per year required for removal 300 <br />Is material der , moist, or wet? Moist <br />Specify moisture content if known (t) NA <br />H. LOADING IN TO RAw MATERIAL STOCKPILE <br />Method of loading in (truck bottom dump, front-end loader, etc.) <br />Loading schedule: tons/hour hours/day 3o days/year <br />Proposed controls for loading to stockpile: Rani ira nrn~ HP; 9r,t <br />Controls include: no control, water sprays, total enclosure, partial <br />enclosure, chemical suppressants, reduced drop height, telescoping <br />chute, other (specify) <br />C. RAII MATERIAL BTOCKPILB <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Maximum tons stored at any one time 30000 <br />Length of time pile remains undisturbed u to 1 r <br />Proposed controls for raw material stockpile: (check appropriate bozos) <br /> <br />0 <br />Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />Chemical stabilizer (Type: ). <br />Compacting of piles, method <br />Enclosures: complete, or partial (check one) <br />Other (specify) <br />No control <br />4 <br />