My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125920
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:14 PM
Creation date
11/25/2007 2:37:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995046
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT M LAND DEVELOPMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I. TOPSOIL <br />a. REMOWIL <br /> <br />Maximum tons reaoved per day 300 <br />Tons removed per year 143nn <br />Proposed controls for topsoil removal: (ahsek appropriate bo:ss) <br />^ Moist Material <br />® Water Spray <br />^ Other (apsaify) <br />^ No Control <br />H. TOPSOIL 8TOCICPILE <br />Maximum stored at one time 14300 tons. <br />Maximum stored per year innn tons. <br />Length of time pile remains undisturbed 5 years <br />Proposed controls for topsoil stockpile: (check appropriate boz) <br /> <br />O <br />II. <br />Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />Chemical stabilizer (Type: ). <br />Compacting of piles, method <br />Enclosures: complete, or partial (check oae) <br />Revegetation, (Length of time till revegetation 90 davs ). <br />Other (specify) <br />~No control <br />]1. REMOVl1I. <br />Maximum tons removed per day 3000 <br />Tons removed per year 11500 <br />Equipment used for removal Dozers and scrapers <br />Proposed controls for overburden removal: (check appropriate bo:ea) <br />^ Moist Material <br />® Water Spray <br />^ Other (specify) <br />^ No Control <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.