My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125894
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:13 PM
Creation date
11/25/2007 2:34:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/25/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />The excess material storage area will be seeded with the soil stabilization <br />seed mix. <br />The Portal B excess material stockpile will not affect ground water. All <br />surface run-off from the stockpile will report to a sediment pond. The stability <br />analyses and drainage controls referenced above demonstrate the stockpile <br />will not adversely affect the environment or society. The stockpile is located <br />on land owned by the Operator so there are no concerns with regard to <br />persons with a legal interest in the land or appurtenances thereto. <br />Final reclamation of the Portal B excess material storage area will require <br />the entire stockpile to be loaded, hauled, placed and compacted in the B- <br />Seam portal area to return the portal area to approximate original contour. <br />The ephemeral drainage channels disturbed by the B-Seam portals and the <br />Portal B excess material stockpile will be plated with rip rap as shown on. <br />Map 18, Postmining Topography. The surface areas will be covered with <br />topsoil and seeded with the approved seed mix. <br />r~ <br />LJ <br /> <br />(a) A surface blasting plan was required for the construction of the mine <br />facilities. The blasting plan follows: <br />(a)(i) This surface blasting plan is intended to apply to the construction of the surface <br />facilities and to isolated events when blasting is required to be performed on the <br />surface which is considered incident to underground mining activities. The blasting <br />requirements for the surface facilities construction will be conducted for the portal <br />face-up area, the development of the coal stockpile bench and the crushing and <br />screening benches and roads as required. Isolated basting events will typically be <br />limited to the excavation of rock to facilitate miscellaneous construction activities <br />and the demolition of concrete foundations and structures. <br />(a)(ii) The Operator will keep a record of each blast and such records will be retained for <br />at least 3 years and shall be available for inspection by the Division and by the <br />public on request. Each blast record will contain the following data: <br />(a)(ii)(1) Name of the Operator; <br />(a)(ii)(2) Location, date, and time of blast; <br />(a)(ii)(3) Name signature and license number of blaster-in-charge; <br />TR-27 2.05 -40 - <br />~ PP12oVED <br />&~z~~o3 <br />S/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.