Laserfiche WebLink
<br />May 23, 1995 <br />989 <br />Green Brothers, Inc. <br />,9„ P. O. BOX 858, FORT MORGAN, COLORADO 80701 <br />TELEPHONE: 303 867-2404 <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Addendum to Application, File No. M-95-030 <br />ATTN: Andy Moore <br />Dear Andy: <br />~FC;FIVEn <br />MAY 2 5 1Q95 <br />pivision ~~ ~•`"1e',~s a c,eologY <br />This is to acknowledge your letter of May 22, 1995 and to respond <br />to your request for additional information. Our replies are <br />numbered to correspond to the questions: <br />(1) The maps have been signed by a Registered Professional <br />Engineer and are included under separate cover. This was an <br />oversight on our part. <br />(2) The dike and berms have been added to MAP ES above and the <br />drainage ditch has been drawn in and labeled. <br />(3) We will stand by our $3500.00 estimate for final reclamation <br />because we are currently closing a permit of comparable size and <br />at this time we are well within budget. <br />(a) MAP E2 has been modified to reflect the phases of <br />development as we now see it. We anticipate 2 1/2 Acres <br />stripped for mining and 1 Acre for topsoil, overburden piles <br />and haul road for each phase. Earthwork, shaping and seeding <br />will be completed fior each phase at the time the next phase <br />is stripped out, <br />(b) We estimate phase I to generate 2000 cu yds of topsoil <br />of which 360 will be used immediately fior reclamation and the <br />balance to be stockpiled. An additional 13000 cu yds over- <br />burden will be stockpiled on the West end ofi the permitted <br />area to expedite removal with trucks. <br />1 <br />