My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125822
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:09 PM
Creation date
11/25/2007 2:28:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 21 AIR EMISSION PERMITS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />3ENERAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 6, 7, and 8) <br />• 1. This permit is issued in reliance upon the accuracy and Completeness of information supplied by the applicant <br />and is conditioned upon conduction of the activity, or construction, installation and operation of the source, in <br />accordance with this information and with representations made by the applicant or applicant's agents. It is valid <br />only for the equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been deter- <br />mined by the APCD to be necessary to assure compliance with the provisions of C.R.S. 1973, 25-7-114(4xg) <br />and, as such, shall be enforceable under the provisions of C.R.S. 1973, 25.7.115 after final approval of the permit <br />has been granted. Emission limits are imposed to ensure that emissions will not (1) interfere with reasonable <br />further progress toward attainment of the NAAQS for polutants as required by C.R.S. 1973, Sections 25.7.114(4xgX1J(8) <br />and 25-7-301(1); Section 172(bx3) of the Federal Clean Air Act, 42 USC 7502 (bx3); and Section IVD.2. of the <br />Air Quality Control Commission Regulation No. 3 or (2) result in an exceedanCe of the NAAQS for pollutants <br />as required by C.R.S. 1973, Sections 25-7-102, 25.7-105(txaxl), and 25-7-201(1xb); Section 165(a)(3) of the Clean <br />Air Act, 42 USC 7475(a)(3); and Section IV.D.1.c. of Air Quality Control Commission Regulation No. 3. <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to, or appeal <br />,f, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence this permit shall <br />oe deemed denied ab initio. This permit may be revoked at any time prior to final approval by the Air Pollution <br />Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air <br />Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. <br />4. This permit and any required attachments must be retained and made available for inspection upon request at <br />the location set forth herein. With respect to a portable source which is moved to a new location, a copy of the <br />revised Air Pollutant Emissions Notice (APEN) (required by law to be submitted to the APCD whenever a portable <br />source is relocated) should be attached to this permit. The permit may be reissued to a new owner by the APCD <br />as provided in Section III.B. of AQCC Regulation No. 3 upon a request for transfer of ownership. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this activity or operation <br />of this source. Final approval of the permit must be secured from the APCD in writing in accordance with the <br />previsions of C.R.S. 1973, Section 25.7.114(4)(j) and Section IV.H. of AQCC Regulation No. 3. Final approval <br />cannot be granted until the operation or activity commences and has been verified by the APCD as conforming <br />in all respects with the conditions of the permit. If the APCD so determines, it will provide written documentation <br />of such final approval, which does constitute "final" authority to operate. <br />6. THIS PERMIT AUTOMATICALLY EXPIRES IFyou (t) do not commence constructron or operatron within t8 months <br />after either the date of issuance of this permit or the date on which such construction or acuv~ty was scheduled <br />to commence as set forth in the permit, whichever is later. (2) d~sco~,tinue construchon for a period of 18 months <br />or more, or (3) do not complete construction within a reasonable ume of the estimated completion date. Exten- <br />sions of the expiration date may be granted by the APCD upon a showing o1 good cause by the permittee. <br />7. YOU MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to commencement of <br />the permitted operation or activity. Fatlure to do so is a violation of C.R.S. 1973, Section 25-7.1 t 4(4)(j) and Regula- <br />tion No. 3., Section IV.H.1., and can result in the revocation of the permit. <br />8. YOU MUST obtain final approval within six months of the commencement of operation as that term ~s defined <br />by the AQCC. Failure to obtain final approval will result in the revocation of the permit. <br />9. Violation of the terms of a permit which has received linal approval or of the provisions of the Colorado Air Quality <br />Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions <br />under C.R.S. 1973, Sections 25-7-1151enforcement), 25.7.121 (injunctions). 25-7.122 (civil penalties) and 25-1-114 <br />(criminal penalties). <br />APCD;&3 (REV. aa&7J <br />
The URL can be used to link to this page
Your browser does not support the video tag.