Laserfiche WebLink
FRQhI , <br />FAX ND. 17198464975 Aug. 22 2007 09:i5RM P6 <br />10. No refuse or acid-forming or toxic materials will be involved in this mining <br />operation. This will be strictly a dry pit operation extraction an alluvial gravel <br />deposit that is chemically inert. No chemicals of any type will be required for <br />processing the product. No refuse will be generated. <br />11. The hydrologc balance will not be impacted as neither surface water nor ground <br />water will be intercepted by this operation. Berms or diversion ditches will be <br />constructed to prevent surface waters from enteriag and contacting disturbed <br />areas. The down slope area will be either termed or silt fence andlor straw bales <br />used to prevent sediment loading to surface waters. <br />12. The excavated material will be crushed on site. <br />13. The primary produced to be rained includes sand, gravel and fill materials. <br />14. There arc no incidental products known or proposed W be extracted from this <br />operation. <br />15. The overburden depth varies from one (1 }foot to eight (8} feet, but is expected to <br />average three (3) foot in thickness. <br />16. No improvements are planned for existing roadways. <br />17. Water used for dust control will be transported into the site by truck and sprayed <br />on haul roads and stockpiles as needed.. <br />Exhibit C -Page 2 (Revised 8/Z Il07) <br />