Laserfiche WebLink
SENECA II MINE <br />ROUTP COUNTY, COIARADO <br />REJISIONS TO <br />PEf3+II'P NO. C-005-80 <br /> Date Date <br /> No. Subiect Submitted roved <br /> 1 Fencing Permit Area 04/30/82 05/06/82 <br /> 2 Diversion Ditch/Redesign #004 Pont 08/27/82 09/17/82 <br /> 3 Change in Facilities 07/11/83 07/21/83 <br /> 4 Scraper Road 09/23/83 10/03/83 <br /> 5 Wolf Creels Augerinq 12/01/83 12/02/83 <br /> 6 Topsoil Variance 09/30/83 02/29/84 <br /> 7 Haul Road Reconstruction 03/06/84 04/10/84 <br /> 8 Wolf Creek Drilling Plan 04/30/84 05/17/84 <br /> 9 Truck Wash 05/01/84 05/25/84 <br /> 10 Bone Yard/Stream Buffer Zone 06/14/84 07/16/84 <br /> 11 Herbicide Spraying 06/11/84 06/15/84 <br /> 12 Thick Wash Pohl 07/05/84 07/11/84 <br /> 13 Topsoil Removal Ahead of Minim 08/10/84 08/27/84 <br /> 14 Change in Seed Mix 08/20/84 09/10/84 <br /> 15 Solid Waste Disposal/Rills and Gullies 09/04/84 09/10/84 <br /> 16 <br />17 Dragline Deadhead Route <br />Coal Stockpile/Auger Mining (Wadge Area) 10/09/84 <br />12/21/84 10/17/84 <br />01/16/85 <br /> 18 Relocation of Haul Road B 03/28/85 03/28/85 <br /> 19 Marmot Hotels 2 07/31/85 ------- <br /> 20 Blasting Schedule C2~ange 01/08/86 01/08/86 <br /> 21 Blasting Schedule Change 04/21/86 04/25/86 <br /> 22 Scraper Road Reactivation 07/03/86 07/28/86 <br /> 23 Topsoil Stockpile LL 09/19/86 10/06/86 <br /> 24 Temporary Scraper Pit 01/30/87 02/02/87 <br /> 25 Noxious Weed Control Plan 05/06/87 05/28/87 <br /> 26 Spoil and Topsoil Monitoring 05/13/87 06/22/87 <br /> 27 770 Dragline Deadhead Route '08/10/87 08/21/87 <br /> 28 ElA Haul Road Relocation 10/13/87 10/13/87 <br /> 29 Reclamation Delay, Perimeter Markers, <br /> Haul Roads 06/13/89 06/13/89 <br /> 30 Al Haul Road Ramp and Dragline <br /> Erection Site 10/13/87 10/13/87 <br /> 31 Shrub and Tree Planting List 04/25/88 05/04/88 <br /> 32 770 Deadhead and Stockpile JJ 09/23/88 10/11/88 <br /> 33 Delay in Reclamation 06/13/89 06/13/89 <br /> 34 Petroleum Contaminated Material Piles 11/18/91 12/20/91 <br /> 35 Relocation of Diversion Ditch No. 1 08/13/92 08/13/92 <br /> 36 Delay in Reclamation 09/02/92 10/05/92 <br /> 37 Temporary Stocktank Certifications 09/11/92 09/11/92 <br /> 38 Wolf Creek Fill Inspection Frequency 10/28/92 10/30/92 <br /> 39 Te~orary Topsoil Stockpile PP 04/16/93 04/16/93 <br />. 40 Revise Affected Lands Bwndary 05/03/93 05/19/93 <br />Revised 11/11/94 <br />