Laserfiche WebLink
PRA 8HOr97 <br />CULVERT REMOVAL WORKSHEET(11 Pape3 <br />• <br />Dlamelerm Lenpth'A Deptli DbposaP~ CuClnpai Ewcava0on~'~ BacW9f'~ TOTAL <br />CuMrt IDm On) OuantityrO (R) (R) (f/R) (SIR) (SIR) (SM) COST <br />SA7 30 1 210 5 1.90 1.40 1.06 913.50 <br />SA7A 30 1 210 5 1.90 1.40 1.05 913.50 <br />SAB 18 1 180 3 0.68 0.50 0.38 260.80 <br />SA9 24 1 180 4 1.22 0.60 0.45 408.80 <br />GRAND TOTAL <br />Nate: (1) Sea Map M61, Drainage and Sedlmant Control, !or all cuhert bcetbne. <br />(2) From Table 4.t.1. <br />(3) Coat Inlomratbn from CDMG. <br />• <br />• <br />5730,758 <br />MAY 1 3 i~~9 <br />